You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@manifoldcf.apache.org by "Piergiorgio Lucidi (Reopened) (JIRA)" <ji...@apache.org> on 2011/09/30 20:15:45 UTC

[jira] [Reopened] (CONNECTORS-263) Long-running tests should all be moved to Maven's integration-test phase

     [ https://issues.apache.org/jira/browse/CONNECTORS-263?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Piergiorgio Lucidi reopened CONNECTORS-263:
-------------------------------------------


This was not enough because it has broken the Maven build process.
Probably we can solve adding the maven-failsafe-plugin and using the -DskipITs to skip integration test:
http://maven.apache.org/plugins/maven-failsafe-plugin/examples/skipping-test.html

I hope to spend some time on this issue very soon.
                
> Long-running tests should all be moved to Maven's integration-test phase
> ------------------------------------------------------------------------
>
>                 Key: CONNECTORS-263
>                 URL: https://issues.apache.org/jira/browse/CONNECTORS-263
>             Project: ManifoldCF
>          Issue Type: Improvement
>          Components: Build
>    Affects Versions: ManifoldCF 0.4
>            Reporter: Karl Wright
>            Assignee: Piergiorgio Lucidi
>             Fix For: ManifoldCF 0.4
>
>
> Long-running tests should be moved to Maven's integration-test phase.
> (which are all in root-level "tests" directory) 

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira