You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hawq.apache.org by "Yi Jin (JIRA)" <ji...@apache.org> on 2016/02/03 04:12:39 UTC

[jira] [Resolved] (HAWQ-380) Wrongly validate resource pool status when index of allocated resources is not complete

     [ https://issues.apache.org/jira/browse/HAWQ-380?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Yi Jin resolved HAWQ-380.
-------------------------
       Resolution: Fixed
    Fix Version/s: 2.0.0

> Wrongly validate resource pool status when index of allocated resources is not complete
> ---------------------------------------------------------------------------------------
>
>                 Key: HAWQ-380
>                 URL: https://issues.apache.org/jira/browse/HAWQ-380
>             Project: Apache HAWQ
>          Issue Type: Bug
>          Components: Resource Manager
>            Reporter: Yi Jin
>            Assignee: Yi Jin
>             Fix For: 2.0.0
>
>
>  716 2016-01-31 07:19:12.684693 PST,,,p9002,th1266407616,,,,0,con4,,seg-10000,,,,,"LOG","00000","Resource manager decides to timeout 2 resource containers in cluster including 3 healthy nodes.",,,,,,,0,,"resourcepool.c",3305,
>  717 2016-01-31 07:19:12.684723 PST,,,p9002,th1266407616,,,,0,con4,,seg-10000,,,,,"LOG","00000","Resource manager decides to return container 4 in host test3",,,,,,,0,,"resourcepool.c",3449,
>  718 2016-01-31 07:19:12.751465 PST,,,p9002,th1266407616,,,,0,con4,,seg-10000,,,,,"FATAL","XX000","HAWQ RM Validation. The allocated resource ordered index contains 2 nodes, expect 3 nodes. (resourcepool.c:3991)",,,,,,,0,,"reso     urcepool.c",3991,"Stack trace:
>  719 1    0x87120f postgres <symbol not found> (elog.c:491)
>  720 2    0x8718e9 postgres elog_finish (elog.c:1439)
>  721 3    0x8df6bf postgres validateResourcePoolStatus (resourcepool.c:3998)
>  722 4    0x8e1042 postgres timeoutIdleGRMResourceToRBByRatio (resourcepool.c:3417)
>  723 5    0x8e13f5 postgres timeoutIdleGRMResourceToRB (resourcepool.c:3314)
>  724 6    0x8fe105 postgres MainHandlerLoop (resourcemanager.c:677)
>  725 7    0x8fe4f0 postgres ResManagerMainServer2ndPhase (resourcemanager.c:517)
>  726 8    0x8fe924 postgres ResManagerMain (resourcemanager.c:329)
>  727 9    0x8fecb1 postgres ResManagerProcessStartup (resourcemanager.c:400)
>  728 10   0x75e3a8 postgres <symbol not found> (postmaster.c:3674)
>  729 11   0x75f262 postgres <symbol not found> (postmaster.c:4020)
>  730 12   0x76460d postgres <symbol not found> (postmaster.c:2138)
>  731 13   0x76616e postgres PostmasterMain (postmaster.c:6520)
>  732 14   0x6c081a postgres main (main.c:226)
>  733 15   0x3c1e81ed1d libc.so.6 __libc_start_main (??:0)
>  734 16   0x4a2589 postgres <symbol not found> (??:0)
>  735 "



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)