You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Nathan Roberts (JIRA)" <ji...@apache.org> on 2017/07/25 15:30:01 UTC

[jira] [Assigned] (YARN-6867) AbstractYarnScheduler reports the configured maximum resources, instead of the actual, even after the configured waittime

     [ https://issues.apache.org/jira/browse/YARN-6867?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Nathan Roberts reassigned YARN-6867:
------------------------------------

    Assignee: Nathan Roberts

> AbstractYarnScheduler reports the configured maximum resources, instead of the actual, even after the configured waittime
> -------------------------------------------------------------------------------------------------------------------------
>
>                 Key: YARN-6867
>                 URL: https://issues.apache.org/jira/browse/YARN-6867
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: scheduler
>            Reporter: Muhammad Samir Khan
>            Assignee: Nathan Roberts
>         Attachments: YARN-6867.001.patch
>
>
> AbstractYarnScheduler has a configured wait time during which it reports the maximum resources from the configuration instead of the actual resources available in the cluster. However, the first query after the wait time expiration is responded by the configured maximum resources instead of the actual maximum resources. This can result in a app submission to fail with an InvalidResourceRequestException (will attach a unit test in the patch) since the maximum resources reported by the RM is different than the one it sanity checks against at app submission.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-issues-help@hadoop.apache.org