You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Ufuk Celebi (JIRA)" <ji...@apache.org> on 2017/07/03 12:08:00 UTC
[jira] [Created] (FLINK-7067) Cancel with savepoint does not
restart checkpoint scheduler on failure
Ufuk Celebi created FLINK-7067:
----------------------------------
Summary: Cancel with savepoint does not restart checkpoint scheduler on failure
Key: FLINK-7067
URL: https://issues.apache.org/jira/browse/FLINK-7067
Project: Flink
Issue Type: Bug
Components: State Backends, Checkpointing
Affects Versions: 1.3.1
Reporter: Ufuk Celebi
The `CancelWithSavepoint` action of the JobManager first stops the checkpoint scheduler, then triggers a savepoint, and cancels the job after the savepoint completes.
If the savepoint fails, the command should not have any side effects and we don't cancel the job. The issue is that the checkpoint scheduler is not restarted though.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)