You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Hadoop QA (JIRA)" <ji...@apache.org> on 2018/11/01 07:37:00 UTC

[jira] [Commented] (YARN-8961) [UI2] Flow Run End Time shows 'Invalid date'

    [ https://issues.apache.org/jira/browse/YARN-8961?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16671207#comment-16671207 ] 

Hadoop QA commented on YARN-8961:
---------------------------------

| (/) *{color:green}+1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue}  0m 13s{color} | {color:blue} Docker mode activated. {color} |
|| || || || {color:brown} Prechecks {color} ||
| {color:green}+1{color} | {color:green} @author {color} | {color:green}  0m  0s{color} | {color:green} The patch does not contain any @author tags. {color} |
|| || || || {color:brown} trunk Compile Tests {color} ||
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green} 22m  7s{color} | {color:green} trunk passed {color} |
| {color:green}+1{color} | {color:green} shadedclient {color} | {color:green} 34m  0s{color} | {color:green} branch has no errors when building and testing our client artifacts. {color} |
|| || || || {color:brown} Patch Compile Tests {color} ||
| {color:green}+1{color} | {color:green} mvninstall {color} | {color:green}  0m 13s{color} | {color:green} the patch passed {color} |
| {color:green}+1{color} | {color:green} whitespace {color} | {color:green}  0m  0s{color} | {color:green} The patch has no whitespace issues. {color} |
| {color:green}+1{color} | {color:green} shadedclient {color} | {color:green} 13m 31s{color} | {color:green} patch has no errors when building and testing our client artifacts. {color} |
|| || || || {color:brown} Other Tests {color} ||
| {color:green}+1{color} | {color:green} asflicense {color} | {color:green}  0m 30s{color} | {color:green} The patch does not generate ASF License warnings. {color} |
| {color:black}{color} | {color:black} {color} | {color:black} 48m 56s{color} | {color:black} {color} |
\\
\\
|| Subsystem || Report/Notes ||
| Docker | Client=17.05.0-ce Server=17.05.0-ce Image:yetus/hadoop:8f97d6f |
| JIRA Issue | YARN-8961 |
| JIRA Patch URL | https://issues.apache.org/jira/secure/attachment/12946494/YARN-8961.001.patch |
| Optional Tests |  dupname  asflicense  shadedclient  |
| uname | Linux 25cf677498e7 3.13.0-143-generic #192-Ubuntu SMP Tue Feb 27 10:45:36 UTC 2018 x86_64 x86_64 x86_64 GNU/Linux |
| Build tool | maven |
| Personality | /testptch/patchprocess/precommit/personality/provided.sh |
| git revision | trunk / 2e8ac14 |
| maven | version: Apache Maven 3.3.9 |
| Max. process+thread count | 311 (vs. ulimit of 10000) |
| modules | C: hadoop-yarn-project/hadoop-yarn/hadoop-yarn-ui U: hadoop-yarn-project/hadoop-yarn/hadoop-yarn-ui |
| Console output | https://builds.apache.org/job/PreCommit-YARN-Build/22398/console |
| Powered by | Apache Yetus 0.8.0   http://yetus.apache.org |


This message was automatically generated.



> [UI2] Flow Run End Time shows 'Invalid date'
> --------------------------------------------
>
>                 Key: YARN-8961
>                 URL: https://issues.apache.org/jira/browse/YARN-8961
>             Project: Hadoop YARN
>          Issue Type: Bug
>            Reporter: Charan Hebri
>            Assignee: Akhil PB
>            Priority: Major
>         Attachments: Invalid_Date.png, YARN-8961.001.patch
>
>
> End Time for Flow Runs is shown as *Invalid date* for runs that are in progress. This should be shown as *N/A* just like how it is shown for 'CPU VCores' and 'Memory Used'. Attached relevant screenshot.
> cc [~akhilpb]



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-issues-help@hadoop.apache.org