You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "stack (Created) (JIRA)" <ji...@apache.org> on 2011/12/10 07:31:40 UTC

[jira] [Created] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Move hbase 0.92RC1 on to hadoop 1.0.0RC2
----------------------------------------

                 Key: HBASE-5006
                 URL: https://issues.apache.org/jira/browse/HBASE-5006
             Project: HBase
          Issue Type: Task
            Reporter: stack


It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.

Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13171429#comment-13171429 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-0.92 #193 (See [https://builds.apache.org/job/HBase-0.92/193/])
    HBASE-5049 TestHLogSplit.testLogRollAfterSplitStart not working due to HBASE-5006

stack : 
Files : 
* /hbase/branches/0.92/CHANGES.txt
* /hbase/branches/0.92/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Patch Available  (was: Open)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Patch Available  (was: Open)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13171488#comment-13171488 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-TRUNK-security #35 (See [https://builds.apache.org/job/HBase-TRUNK-security/35/])
    HBASE-5049 TestHLogSplit.testLogRollAfterSplitStart not working due to HBASE-5006

stack : 
Files : 
* /hbase/trunk/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Attachment: 5006-v5-092.txt

Branch patch is slightly different. Here is what I committed (a comment in pom not in trunk threw off the patch)
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Attachment: 5006.txt

Pull in 1.0.0rc2 hadoop and zk 3.4.1rc0 (also upped docbook plugin from 2.0.11 to 2.0.13).
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>         Attachments: 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Attachment: 5006-v2.txt

This one looks to do better (include commons-configuration)
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hadoop QA (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13167928#comment-13167928 ] 

Hadoop QA commented on HBASE-5006:
----------------------------------

-1 overall.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12507055/5006-v3.txt
  against trunk revision .

    +1 @author.  The patch does not contain any @author tags.

    -1 tests included.  The patch doesn't appear to include any new or modified tests.
                        Please justify why no new tests are needed for this patch.
                        Also please list what manual steps were performed to verify this patch.

    -1 javadoc.  The javadoc tool appears to have generated -160 warning messages.

    +1 javac.  The applied patch does not increase the total number of javac compiler warnings.

    -1 findbugs.  The patch appears to introduce 75 new Findbugs (version 1.3.9) warnings.

    +1 release audit.  The applied patch does not increase the total number of release audit warnings.

     -1 core tests.  The patch failed these unit tests:
                       org.apache.hadoop.hbase.replication.TestReplicationSource
                  org.apache.hadoop.hbase.replication.TestReplication
                  org.apache.hadoop.hbase.regionserver.TestHRegion
                  org.apache.hadoop.hbase.client.TestAdmin
                  org.apache.hadoop.hbase.regionserver.TestStore

Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/492//testReport/
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/492//artifact/trunk/patchprocess/newPatchFindbugsWarnings.html
Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/492//console

This message is automatically generated.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hadoop QA (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13167776#comment-13167776 ] 

Hadoop QA commented on HBASE-5006:
----------------------------------

-1 overall.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12507023/5006-v2.txt
  against trunk revision .

    +1 @author.  The patch does not contain any @author tags.

    -1 tests included.  The patch doesn't appear to include any new or modified tests.
                        Please justify why no new tests are needed for this patch.
                        Also please list what manual steps were performed to verify this patch.

    -1 patch.  The patch command could not apply the patch.

Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/490//console

This message is automatically generated.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13168712#comment-13168712 ] 

stack commented on HBASE-5006:
------------------------------

testadmin failed because of too many open files... committing.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Open  (was: Patch Available)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13168949#comment-13168949 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-TRUNK #2543 (See [https://builds.apache.org/job/HBase-TRUNK/2543/])
    HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2

stack : 
Files : 
* /hbase/trunk/pom.xml
* /hbase/trunk/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java
* /hbase/trunk/src/test/java/org/apache/hadoop/hbase/regionserver/TestHRegion.java
* /hbase/trunk/src/test/java/org/apache/hadoop/hbase/regionserver/TestStore.java
* /hbase/trunk/src/test/java/org/apache/hadoop/hbase/replication/TestReplicationSource.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Open  (was: Patch Available)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13169062#comment-13169062 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-0.92 #189 (See [https://builds.apache.org/job/HBase-0.92/189/])
    HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2; second installment.. applied v3 instead of v5 -- remove MediumTest mistaken import
HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2; second installment.. applied v3 instead of v5

stack : 
Files : 
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/replication/TestReplicationSource.java

stack : 
Files : 
* /hbase/branches/0.92/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/regionserver/TestHRegion.java
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/regionserver/TestStore.java
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/replication/TestReplicationSource.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hadoop QA (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13168706#comment-13168706 ] 

Hadoop QA commented on HBASE-5006:
----------------------------------

-1 overall.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12507219/5006-v5.txt
  against trunk revision .

    +1 @author.  The patch does not contain any @author tags.

    +1 tests included.  The patch appears to include 10 new or modified tests.

    -1 javadoc.  The javadoc tool appears to have generated -152 warning messages.

    +1 javac.  The applied patch does not increase the total number of javac compiler warnings.

    -1 findbugs.  The patch appears to introduce 75 new Findbugs (version 1.3.9) warnings.

    +1 release audit.  The applied patch does not increase the total number of release audit warnings.

     -1 core tests.  The patch failed these unit tests:
                       org.apache.hadoop.hbase.client.TestAdmin

Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/499//testReport/
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/499//artifact/trunk/patchprocess/newPatchFindbugsWarnings.html
Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/499//console

This message is automatically generated.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13171478#comment-13171478 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-0.92-security #40 (See [https://builds.apache.org/job/HBase-0.92-security/40/])
    HBASE-5049 TestHLogSplit.testLogRollAfterSplitStart not working due to HBASE-5006

stack : 
Files : 
* /hbase/branches/0.92/CHANGES.txt
* /hbase/branches/0.92/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13168844#comment-13168844 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-0.92 #187 (See [https://builds.apache.org/job/HBase-0.92/187/])
    HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2

stack : 
Files : 
* /hbase/branches/0.92/CHANGES.txt
* /hbase/branches/0.92/pom.xml

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hadoop QA (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13167007#comment-13167007 ] 

Hadoop QA commented on HBASE-5006:
----------------------------------

-1 overall.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12506874/5006.txt
  against trunk revision .

    +1 @author.  The patch does not contain any @author tags.

    -1 tests included.  The patch doesn't appear to include any new or modified tests.
                        Please justify why no new tests are needed for this patch.
                        Also please list what manual steps were performed to verify this patch.

    -1 javadoc.  The javadoc tool appears to have generated -160 warning messages.

    +1 javac.  The applied patch does not increase the total number of javac compiler warnings.

    -1 findbugs.  The patch appears to introduce 75 new Findbugs (version 1.3.9) warnings.

    +1 release audit.  The applied patch does not increase the total number of release audit warnings.

     -1 core tests.  The patch failed these unit tests:
                       org.apache.hadoop.hbase.regionserver.TestKeyValueHeap
                  org.apache.hadoop.hbase.io.hfile.TestHFileWriterV2
                  org.apache.hadoop.hbase.io.hfile.TestHFileReaderV1
                  org.apache.hadoop.hbase.regionserver.TestStoreFile
                  org.apache.hadoop.hbase.zookeeper.TestHQuorumPeer
                  org.apache.hadoop.hbase.master.TestCatalogJanitor
                  org.apache.hadoop.hbase.security.TestUser
                  org.apache.hadoop.hbase.regionserver.TestColumnSeeking
                  org.apache.hadoop.hbase.regionserver.TestCompaction
                  org.apache.hadoop.hbase.regionserver.TestScanner
                  org.apache.hadoop.hbase.regionserver.TestSplitTransaction
                  org.apache.hadoop.hbase.coprocessor.TestCoprocessorInterface
                  org.apache.hadoop.hbase.mapreduce.TestSimpleTotalOrderPartitioner
                  org.apache.hadoop.hbase.regionserver.TestCompoundBloomFilter
                  org.apache.hadoop.hbase.regionserver.TestScanDeleteTracker
                  org.apache.hadoop.hbase.TestFSTableDescriptorForceCreation
                  org.apache.hadoop.hbase.regionserver.TestKeepDeletes
                  org.apache.hadoop.hbase.filter.TestDependentColumnFilter
                  org.apache.hadoop.hbase.regionserver.TestResettingCounters
                  org.apache.hadoop.hbase.coprocessor.TestRegionObserverStacking
                  org.apache.hadoop.hbase.regionserver.TestQueryMatcher
                  org.apache.hadoop.hbase.io.TestHalfStoreFileReader
                  org.apache.hadoop.hbase.io.hfile.TestSeekTo
                  org.apache.hadoop.hbase.regionserver.TestScanWithBloomError
                  org.apache.hadoop.hbase.regionserver.wal.TestWALActionsListener
                  org.apache.hadoop.hbase.regionserver.TestHRegionInfo
                  org.apache.hadoop.hbase.regionserver.TestCompactSelection
                  org.apache.hadoop.hbase.filter.TestColumnPrefixFilter
                  org.apache.hadoop.hbase.io.hfile.TestHFile
                  org.apache.hadoop.hbase.filter.TestMultipleColumnPrefixFilter
                  org.apache.hadoop.hbase.regionserver.TestMinVersions
                  org.apache.hadoop.hbase.regionserver.TestGetClosestAtOrBefore
                  org.apache.hadoop.hbase.regionserver.TestExplicitColumnTracker
                  org.apache.hadoop.hbase.regionserver.TestWideScanner
                  org.apache.hadoop.hbase.regionserver.TestScanWildcardColumnTracker
                  org.apache.hadoop.hbase.io.hfile.TestReseekTo
                  org.apache.hadoop.hbase.filter.TestFilter
                  org.apache.hadoop.hbase.regionserver.wal.TestHLogMethods

Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/485//testReport/
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/485//artifact/trunk/patchprocess/newPatchFindbugsWarnings.html
Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/485//console

This message is automatically generated.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13167003#comment-13167003 ] 

stack commented on HBASE-5006:
------------------------------

So, the hadoop-1.0.0 in staging is not rc2 it seems.  Besides, I can't depend on staging in case it gets promoted before during life of this rc.  So, I put hadoop and zk up in my own little repo over on people.apache.org.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Assignee: stack
      Status: Patch Available  (was: Open)

See how hadoop 1.0.0rc2 and zk3.4.1rc0 do against hadoop-qa.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hadoop QA (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13168109#comment-13168109 ] 

Hadoop QA commented on HBASE-5006:
----------------------------------

-1 overall.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12507107/5006-v4.txt
  against trunk revision .

    +1 @author.  The patch does not contain any @author tags.

    +1 tests included.  The patch appears to include 7 new or modified tests.

    -1 javadoc.  The javadoc tool appears to have generated -152 warning messages.

    +1 javac.  The applied patch does not increase the total number of javac compiler warnings.

    -1 findbugs.  The patch appears to introduce 75 new Findbugs (version 1.3.9) warnings.

    +1 release audit.  The applied patch does not increase the total number of release audit warnings.

     -1 core tests.  The patch failed these unit tests:
                       org.apache.hadoop.hbase.replication.TestReplicationSource
                  org.apache.hadoop.hbase.client.TestAdmin
                  org.apache.hadoop.hbase.master.TestDistributedLogSplitting

Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/493//testReport/
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/493//artifact/trunk/patchprocess/newPatchFindbugsWarnings.html
Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/493//console

This message is automatically generated.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13171455#comment-13171455 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-TRUNK #2553 (See [https://builds.apache.org/job/HBase-TRUNK/2553/])
    HBASE-5049 TestHLogSplit.testLogRollAfterSplitStart not working due to HBASE-5006

stack : 
Files : 
* /hbase/trunk/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Attachment: 5006-v3.txt

v3 should apply trunk.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Attachment: 5006-v5.txt

The TestReplicationSource failure was legit brought on by hadoop 1.0.0rc2 issue.  This patch adds fix precreating parent dir.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13167936#comment-13167936 ] 

stack commented on HBASE-5006:
------------------------------

The TestHRegion and TestStore fails are because of this patch (others are too many open files).  Looking into it.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13169100#comment-13169100 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-0.92-security #38 (See [https://builds.apache.org/job/HBase-0.92-security/38/])
    HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2; second installment.. applied v3 instead of v5 -- remove MediumTest mistaken import
HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2; second installment.. applied v3 instead of v5
HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2

stack : 
Files : 
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/replication/TestReplicationSource.java

stack : 
Files : 
* /hbase/branches/0.92/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/regionserver/TestHRegion.java
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/regionserver/TestStore.java
* /hbase/branches/0.92/src/test/java/org/apache/hadoop/hbase/replication/TestReplicationSource.java

stack : 
Files : 
* /hbase/branches/0.92/CHANGES.txt
* /hbase/branches/0.92/pom.xml

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Release Note: Packages hadoop 1.0.0rc2.
    Hadoop Flags: Incompatible change
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13168871#comment-13168871 ] 

stack commented on HBASE-5006:
------------------------------

Had to redo the 0.92 application; I missed the patching of tests.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Patch Available  (was: Open)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Open  (was: Patch Available)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Open  (was: Patch Available)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Commented] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "Hudson (Commented) (JIRA)" <ji...@apache.org>.
    [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13169122#comment-13169122 ] 

Hudson commented on HBASE-5006:
-------------------------------

Integrated in HBase-TRUNK-security #31 (See [https://builds.apache.org/job/HBase-TRUNK-security/31/])
    HBASE-5006 Move hbase 0.92RC1 on to hadoop 1.0.0RC2

stack : 
Files : 
* /hbase/trunk/pom.xml
* /hbase/trunk/src/main/java/org/apache/hadoop/hbase/regionserver/wal/HLog.java
* /hbase/trunk/src/test/java/org/apache/hadoop/hbase/regionserver/TestHRegion.java
* /hbase/trunk/src/test/java/org/apache/hadoop/hbase/regionserver/TestStore.java
* /hbase/trunk/src/test/java/org/apache/hadoop/hbase/replication/TestReplicationSource.java

                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Attachment: 5006-v4.txt

TestHRegion was failing because was expecting recursive create and TestStore was failing because its fake filesystem was saying it could not do a non recursive create.  Patch does precreate for former and then for latter, fakes the nonrecursive call to work as it used (in the test).
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

       Resolution: Fixed
    Fix Version/s: 0.92.0
           Status: Resolved  (was: Patch Available)

Committed branch and trunk.
                
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.92.0
>
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006-v5-092.txt, 5006-v5.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] [Updated] (HBASE-5006) Move hbase 0.92RC1 on to hadoop 1.0.0RC2

Posted by "stack (Updated) (JIRA)" <ji...@apache.org>.
     [ https://issues.apache.org/jira/browse/HBASE-5006?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

stack updated HBASE-5006:
-------------------------

    Status: Patch Available  (was: Open)
    
> Move hbase 0.92RC1 on to hadoop 1.0.0RC2
> ----------------------------------------
>
>                 Key: HBASE-5006
>                 URL: https://issues.apache.org/jira/browse/HBASE-5006
>             Project: HBase
>          Issue Type: Task
>            Reporter: stack
>            Assignee: stack
>         Attachments: 5006-v2.txt, 5006-v3.txt, 5006-v4.txt, 5006.txt
>
>
> It looks like I can just add staging repo to our list of repositories in pom and then we'll pick up rc2.
> Running tests now and need to verify that what I am picking up is actually rc2.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira