You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@tez.apache.org by "Jeff Zhang (JIRA)" <ji...@apache.org> on 2015/06/10 03:25:00 UTC
[jira] [Created] (TEZ-2545) Test timed out on
TestCommit.testDAGKilledWhileRunning_OnVertexSuccess
Jeff Zhang created TEZ-2545:
-------------------------------
Summary: Test timed out on TestCommit.testDAGKilledWhileRunning_OnVertexSuccess
Key: TEZ-2545
URL: https://issues.apache.org/jira/browse/TEZ-2545
Project: Apache Tez
Issue Type: Bug
Affects Versions: 0.8.0
Reporter: Jeff Zhang
Assignee: Jeff Zhang
{noformat}
Failed
org.apache.tez.dag.app.dag.impl.TestCommit.testDAGKilledWhileRunning_OnVertexSuccess
Failing for the past 2 builds (Since Unstable#3372 )
运行时间:5 秒
Error Message
test timed out after 5000 milliseconds
Stacktrace
java.lang.Exception: test timed out after 5000 milliseconds
at java.lang.Thread.sleep(Native Method)
at org.apache.tez.dag.app.dag.impl.TestCommit.waitUntil(TestCommit.java:355)
at org.apache.tez.dag.app.dag.impl.TestCommit.testDAGKilledWhileRunning_OnVertexSuccess(TestCommit.java:1652)
{noformat}
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)