You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ignite.apache.org by "Vyacheslav Koptilin (JIRA)" <ji...@apache.org> on 2017/06/22 14:12:02 UTC

[jira] [Assigned] (IGNITE-5076) Optimization of multi-threaded start nodes in tests

     [ https://issues.apache.org/jira/browse/IGNITE-5076?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Vyacheslav Koptilin reassigned IGNITE-5076:
-------------------------------------------

    Assignee: Vyacheslav Koptilin  (was: Dmitriy Govorukhin)

> Optimization of multi-threaded start nodes in tests
> ---------------------------------------------------
>
>                 Key: IGNITE-5076
>                 URL: https://issues.apache.org/jira/browse/IGNITE-5076
>             Project: Ignite
>          Issue Type: Improvement
>            Reporter: Dmitriy Govorukhin
>            Assignee: Vyacheslav Koptilin
>             Fix For: 2.1
>
>
> Concurrent start,will more effective if we have coordinator before, multi-threaded start nodes. If start all nodes concurrent, they will be compete for coordinator role, it is not effective way.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)