You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@ofbiz.apache.org by "Yashwant Dhakad (Jira)" <ji...@apache.org> on 2025/06/03 13:07:00 UTC
[jira] [Created] (OFBIZ-13248) Labor costs are missing from cost calculations in the Manufacturing module, leading to incomplete production run accounting.
Yashwant Dhakad created OFBIZ-13248:
---------------------------------------
Summary: Labor costs are missing from cost calculations in the Manufacturing module, leading to incomplete production run accounting.
Key: OFBIZ-13248
URL: https://issues.apache.org/jira/browse/OFBIZ-13248
Project: OFBiz
Issue Type: Improvement
Components: manufacturing
Affects Versions: Upcoming Branch
Reporter: Yashwant Dhakad
In the Manufacturing module, during cost calculation, labor costs are not included or recorded for respective production runs, even though features to record the workers’ hourly rates and logged hours are available. This omission of labourer’s wages from the final cost calculation, results in incomplete cost reporting, as labor expenses are missing from the “Actual Costs” section of production run’s respective routing tasks. To address this, the system should:
* Calculate labor costs by multiplying the worker’s hourly rate by their logged hours.
* Record these costs as a labor cost entry in the production run’s cost records.
* Include labor costs in the total production run cost displayed in the Manufacturing module.
These changes will ensure accurate cost reporting, improve financial analysis, and eliminate manual calculations.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)