You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Francesco Mari (JIRA)" <ji...@apache.org> on 2016/01/21 11:29:39 UTC
[jira] [Resolved] (OAK-3862) Move integration tests in a different
Maven module
[ https://issues.apache.org/jira/browse/OAK-3862?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Francesco Mari resolved OAK-3862.
---------------------------------
Resolution: Fixed
Fix Version/s: (was: 1.4)
1.3.15
Fixed in r1725897.
> Move integration tests in a different Maven module
> --------------------------------------------------
>
> Key: OAK-3862
> URL: https://issues.apache.org/jira/browse/OAK-3862
> Project: Jackrabbit Oak
> Issue Type: Improvement
> Reporter: Francesco Mari
> Assignee: Francesco Mari
> Labels: modularization, technical_debt
> Fix For: 1.3.15
>
>
> While moving the Segment Store and related packages into its own bundle, I figured out that integration tests contained in {{oak-core}} contribute to a cyclic dependency between the (new) {{oak-segment}} bundle and {{oak-core}}.
> The dependency is due to the usage of {{NodeStoreFixture}} to instantiate different implementations of {{NodeStore}} in a semi-transparent way.
> Tests depending on {{NodeStoreFixture}} are most likely integration tests. A clean solution to this problem would be to move those integration tests into a new Maven module, referencing the API and implementation modules as needed.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)