You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ignite.apache.org by "Alexey Goncharuk (JIRA)" <ji...@apache.org> on 2016/07/14 01:33:20 UTC
[jira] [Assigned] (IGNITE-2378) Data loss Part 2. Add flexible
DataLoss Policy. Improve dataLoss event with batch.
[ https://issues.apache.org/jira/browse/IGNITE-2378?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Alexey Goncharuk reassigned IGNITE-2378:
----------------------------------------
Assignee: Alexey Goncharuk (was: Vladimir Ershov)
> Data loss Part 2. Add flexible DataLoss Policy. Improve dataLoss event with batch.
> ----------------------------------------------------------------------------------
>
> Key: IGNITE-2378
> URL: https://issues.apache.org/jira/browse/IGNITE-2378
> Project: Ignite
> Issue Type: Improvement
> Affects Versions: 1.6
> Reporter: Vladimir Ershov
> Assignee: Alexey Goncharuk
> Labels: 1.6
> Fix For: 2.0
>
> Original Estimate: 40h
> Remaining Estimate: 40h
>
> Next steps for the data loss check functionality development:
> # Introduce new DataLossPolicy, like read-only and others.
> # Think of data restoration and implement if needed.
> # Design solution for the reduce of the amount of EVT_CACHE_REBALANCE_PART_DATA_LOST. (Now it is possible to implement batching for those events). One has to be careful with backward compatibility here.
> # ResetLostPartsMsg should affect only topology with specified version.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)