You are viewing a plain text version of this content. The canonical link for it is here.
Posted to user@ofbiz.apache.org by Rahul Vangari <ra...@vnnogile.in> on 2018/09/12 08:09:45 UTC
How to define lot in a production run?
Hi,
In manufacturing BOM I've defined that "Product 1" can be made from
"Product 2" and in the Routing I have defined "qty to produce" as 10.
Also, I defined the
RoutingProductLink with quantity as 10.
Now ProductionRun is created with Quantity=1. But when the JobShop is
run and completed only 1 quantity is produced.
What is the significance of QtyToProduce in Routing and Quantity in
RoutingProductLink? In short, my question is can I define a lot quantity
for a ProductionRun?
--
Regards,
Rahul Vangari.
vnnogile Solutions Private Limited
www.vnnogile.com
Re: How to define lot in a production run?
Posted by Pierre Smits <pi...@apache.org>.
Hi Rahul,
The quantity to produce for a production run is either set in a manual
process (see [1]), or through MPR processes (based on requirements from
orders).
AIUI, a value set in the quantityToProduce field in a Routing (see [1]), is
not used in the functionalities to create a production run. A production
run is generated either through MRP processes (based on requirements from
orders), or manually through [2]. But I must say that it has been quite a
while ago that I have looked at the intricacies of the functions in the
various production run related services.
Maybe another contributor - with more in-depth knowledge - can chime in to
explain the relationship between the Routing.quantityToProduce and
a ProductionRun.quantityToProduce or the relationship between a
RoutingProductLink.quantity and a ProductionRun.quantityToProduce.
Best regards,
Pierre Smits
*Apache Trafodion <https://trafodion.apache.org>, Vice President*
*Apache Directory <https://directory.apache.org>, PMC Member*
Apache Incubator <https://incubator.apache.org>, committer
*Apache OFBiz <https://ofbiz.apache.org>, contributor (without privileges)
since 2008*
Apache Steve <https://steve.apache.org>, committer
On Wed, Sep 12, 2018 at 10:09 AM, Rahul Vangari <ra...@vnnogile.in>
wrote:
> Hi,
>
> In manufacturing BOM I've defined that "Product 1" can be made from
> "Product 2" and in the Routing I have defined "qty to produce" as 10. Also,
> I defined the
> RoutingProductLink with quantity as 10.
>
> Now ProductionRun is created with Quantity=1. But when the JobShop is run
> and completed only 1 quantity is produced.
>
> What is the significance of QtyToProduce in Routing and Quantity in
> RoutingProductLink? In short, my question is can I define a lot quantity
> for a ProductionRun?
>
> --
> Regards,
> Rahul Vangari.
> vnnogile Solutions Private Limited
> www.vnnogile.com
>
>