You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Andrew Purtell (JIRA)" <ji...@apache.org> on 2019/02/01 19:43:05 UTC
[jira] [Updated] (HBASE-18639) nightly jobs that need to do jdk7 +
jdk8 need more than 6 hours
[ https://issues.apache.org/jira/browse/HBASE-18639?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrew Purtell updated HBASE-18639:
-----------------------------------
Fix Version/s: (was: 1.5.0)
1.5.1
> nightly jobs that need to do jdk7 + jdk8 need more than 6 hours
> ---------------------------------------------------------------
>
> Key: HBASE-18639
> URL: https://issues.apache.org/jira/browse/HBASE-18639
> Project: HBase
> Issue Type: Task
> Components: test
> Reporter: Sean Busbey
> Priority: Major
> Labels: beginner
> Fix For: 1.5.1
>
>
> looks like the branches that need to do 2 jdks will need more than 6 hours, at least until we can parallelize things.
> e.g.
> * [branch-1.2|https://builds.apache.org/view/H-L/view/HBase/job/HBase%20Nightly/job/branch-1.2/buildTimeTrend]
> * [branch-1.3|https://builds.apache.org/view/H-L/view/HBase/job/HBase%20Nightly/job/branch-1.3/buildTimeTrend]
> branch-1.4 and branch-1 are failing in jdk7 checks, so they don't go that long yet, but once we get those tests fixed presumably they'll need the time as well.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)