You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@accumulo.apache.org by "Hudson (JIRA)" <ji...@apache.org> on 2013/04/13 01:56:17 UTC

[jira] [Commented] (ACCUMULO-1202) Add integration-test phase to maven build by using maven-failsafe-plugin

    [ https://issues.apache.org/jira/browse/ACCUMULO-1202?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13630776#comment-13630776 ] 

Hudson commented on ACCUMULO-1202:
----------------------------------

Integrated in Accumulo-1.5-Hadoop-2.0 #76 (See [https://builds.apache.org/job/Accumulo-1.5-Hadoop-2.0/76/])
    ACCUMULO-1202 Add maven-failsafe-plugin execution to the build. No existing unit tests are converted at this time. (Revision 1467503)

     Result = FAILURE
ctubbsii : 
Files : 
* /accumulo/branches/1.5/pom.xml

                
> Add integration-test phase to maven build by using maven-failsafe-plugin
> ------------------------------------------------------------------------
>
>                 Key: ACCUMULO-1202
>                 URL: https://issues.apache.org/jira/browse/ACCUMULO-1202
>             Project: Accumulo
>          Issue Type: Improvement
>    Affects Versions: 1.6.0
>            Reporter: David Medinets
>            Assignee: Christopher Tubbs
>             Fix For: 1.5.0
>
>
> On my VirtualBox Ubuntu server, the tests take six minutes to run. Let's add the failsafe plugin so that we can move the long-running tests to the integration-test phase. See http://antoniogoncalves.org/2012/12/13/lets-turn-integration-tests-with-maven-to-a-first-class-citizen/ for details how to change the pom.xml. Renaming ShellServerTest and TestProxyTableOperations to end in IT would reduce the test execution time by about 50% on my server.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira