You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@tez.apache.org by "Jeff Zhang (JIRA)" <ji...@apache.org> on 2015/09/09 09:33:45 UTC

[jira] [Updated] (TEZ-2790) TEZ-UI: Enhance the DAG View with more runtime information

     [ https://issues.apache.org/jira/browse/TEZ-2790?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jeff Zhang updated TEZ-2790:
----------------------------
    Description: 
Currently the dag view cover some general runtime info (like start_time/end_time/task_num etc). It would be better to include more runtime info, such as 
* Input/output data size. 
* DataSize/RecordNumber transferred on each edge (may use thickness to visualize that ).  
* Time spent on shuffle of each edge. (may use the edge length to visualize that ). 

Once TEZ-2760 is resolved, we can also enhance the dag view with in-progress status. 

  was:
Currently the dag view cover some general runtime info (like start_time/end_time/task_num etc). It would be better to include more runtime info, such as 
* Input/output data size. 
* DataSize/RecordNumber transferred on each edge (may use thickness to visualize that ).  
* Time spent on shuffle of each edge. (may use the edge length to visualize that ). 
* etc.

Once TEZ-2760 is resolved, we can also enhance the dag view with in-progress status. 


> TEZ-UI: Enhance the DAG View with more runtime information 
> -----------------------------------------------------------
>
>                 Key: TEZ-2790
>                 URL: https://issues.apache.org/jira/browse/TEZ-2790
>             Project: Apache Tez
>          Issue Type: Bug
>          Components: UI
>    Affects Versions: 0.8.1
>            Reporter: Jeff Zhang
>
> Currently the dag view cover some general runtime info (like start_time/end_time/task_num etc). It would be better to include more runtime info, such as 
> * Input/output data size. 
> * DataSize/RecordNumber transferred on each edge (may use thickness to visualize that ).  
> * Time spent on shuffle of each edge. (may use the edge length to visualize that ). 
> Once TEZ-2760 is resolved, we can also enhance the dag view with in-progress status. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)