You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Duo Zhang (Jira)" <ji...@apache.org> on 2020/10/10 00:40:00 UTC

[jira] [Resolved] (HBASE-25163) Increase the timeout value for nightly jobs

     [ https://issues.apache.org/jira/browse/HBASE-25163?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Duo Zhang resolved HBASE-25163.
-------------------------------
    Hadoop Flags: Reviewed
    Release Note: Increase timeout value for nightly jobs to 16 hours.
      Resolution: Fixed

Pushed to all active branches.

Thanks all for reviewing.

> Increase the timeout value for nightly jobs
> -------------------------------------------
>
>                 Key: HBASE-25163
>                 URL: https://issues.apache.org/jira/browse/HBASE-25163
>             Project: HBase
>          Issue Type: Sub-task
>          Components: jenkins, scripts, test
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Major
>             Fix For: 3.0.0-alpha-1, 2.3.3, 1.7.0, 2.4.0, 1.4.14, 2.2.7
>
>
> The new hbase node is m5.2xlarge, which means it has 8 cores and 32 GB memory, while the old H node has 16 or 24 cores, 100GB memory, so it will spend more time to finish the nightly jobs. Since the new nodes are exclusive for HBase only, we are free to increase the timeout value.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)