You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@flink.apache.org by "Chesnay Schepler (Jira)" <ji...@apache.org> on 2022/12/02 17:46:00 UTC

[jira] [Created] (FLINK-30286) Run rat plugin in validate phase

Chesnay Schepler created FLINK-30286:
----------------------------------------

             Summary: Run rat plugin in validate phase
                 Key: FLINK-30286
                 URL: https://issues.apache.org/jira/browse/FLINK-30286
             Project: Flink
          Issue Type: Technical Debt
          Components: Build System
            Reporter: Chesnay Schepler
            Assignee: Chesnay Schepler
             Fix For: 1.17.0






--
This message was sent by Atlassian Jira
(v8.20.10#820010)