You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@kylin.apache.org by "Guoliang Sun (Jira)" <ji...@apache.org> on 2022/12/07 11:54:00 UTC
[jira] [Created] (KYLIN-5349) Supports project-level configuration of concurrent task limits
Guoliang Sun created KYLIN-5349:
-----------------------------------
Summary: Supports project-level configuration of concurrent task limits
Key: KYLIN-5349
URL: https://issues.apache.org/jira/browse/KYLIN-5349
Project: Kylin
Issue Type: Improvement
Affects Versions: 5.0-alpha
Reporter: Guoliang Sun
Fix For: 5.0-alpha
When the service contains multiple projects, different projects have different requirements for the number of concurrent tasks to be executed, for example, project A needs 5 concurrent tasks, project B supports 10 concurrent tasks. Currently, only parameters are available to control the same number of concurrency for each project at the system level, and it cannot support different concurrency requirements for different projects.
{code:java}
kylin.job.max-concurrent-jobs {code}
Support for limiting concurrent tasks at the project level would help users better manage cluster resource usage.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)