Posted to user@ofbiz.apache.org by nico61 <ni...@libero.it> on 2008/07/10 17:40:54 UTC

MRP using Facility Group

I'm trying to execute a MRP session using a Facility Group instead of a
Facility, but the system returns to me the following error "facilityId and
manufacturingFacilityId cannot be null". 
 
Regards  
Nico 
-- 
View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
Sent from the OFBiz - User mailing list archive at Nabble.com.


Re: MRP using Facility Group

Posted by nico61 <ni...@libero.it>.
I just try to modified my BOM and now the MRP process running correctly. 

I just another question. In my BOM, I use a configurable product with two 
configurable options ( finished good ) and I have the following problems:

a) I don't see in the related order the associated products
b) if it's possible to avoid the creation of production run

How should organize my BOM (and relative process) , if I need to use
external resources?

Nico


Jacopo Cappellato-3 wrote:
> 
> how is the BOM of the door setup?
> 
> Jacopo
> 
> On Jul 11, 2008, at 11:07 AM, nico61 wrote:
> 
>>
>> in this way, I obtain a third "Proposed Purchase Order with a  
>> quantity = 10"
>> for the door and
>> I need to have a requirement for manufacturing orders for the door  
>> in the
>> PLANT ....
>>
>> Nico
>>
>>
>>
>> Jacopo Cappellato-3 wrote:
>>>
>>> Just try to set the inventory settings for the "door" into the
>>> WAREHOUSE and not into the PLANT.
>>>
>>> WAREHOUSE:
>>>> door
>>>> Product type = Configurable good
>>>> ATP=QOH=OQ = 0
>>>> Minimum Stock = 10
>>>
>>> Jacopo
>>>
>>>
>>> On Jul 11, 2008, at 10:34 AM, nico61 wrote:
>>>
>>>>
>>>> Hi Jacopo,
>>>>
>>>> my current trunk version is 672765. I already used your suggestion  
>>>> and
>>>> configured
>>>> a facility as WAREHOUSE and the other as PLANT as follows:
>>>>
>>>> facility associated as WAREHOUSE
>>>>
>>>> Aluminum Door Handles, Plastic Door Handles and Hardboard Door  
>>>> anyone
>>>> configured as:
>>>> Product type = Finished good
>>>> ATP=QOH=OQ = 0
>>>> Minimum Stock = 10
>>>>
>>>> facility associated as PLANT
>>>>
>>>> door
>>>> Product type = Configurable good
>>>> ATP=QOH=OQ = 0
>>>> Minimum Stock = 10
>>>>
>>>> I executed the MRP and reached the following results:
>>>>
>>>> Aluminum Door Handles
>>>> Facility: 10030
>>>> Minimum Stock: 10
>>>> Proposed Purchase Order with a quantity = 10
>>>>
>>>> Plastic Door Handles
>>>> Facility: 10030
>>>> Minimum Stock: 10
>>>> Proposed Purchase Order with a quantity = 10
>>>>
>>>> Hardboard Door
>>>> Facility: 10030
>>>> Minimum Stock: 10
>>>> Proposed Purchase Order with a quantity = 10
>>>>
>>>> but no requirements for manufacturing orders concerning the product
>>>> door
>>>> ....
>>>>
>>>> Is my mistake the door product type ? I also used another type as
>>>> Finished
>>>> good, even if is not my
>>>> goal, but I reached the same result .......
>>>>
>>>> thanks
>>>> Nico
>>>>
>>>>
>>>> Jacopo Cappellato-3 wrote:
>>>>>
>>>>> Hi Nico,
>>>>>
>>>>> in its current (pretty basic) implementation of the facility group
>>>>> support, you have to create a facility group:
>>>>> * with a facility associated as WAREHOUSE: used by the MRP for
>>>>> inventory levels
>>>>> * and with a facility associated as PLANT: used by the MRP when it
>>>>> generates requirements for manufacturing orders
>>>>>
>>>>> If you need something more complex you'll have to enhance the code
>>>>> (MrpServices.java, around lines 610-650)
>>>>>
>>>>> Jacopo
>>>>>
>>>>> PS: the above suggestions are for the TRUNK version, not the  
>>>>> release
>>>>> 4... you'll have to verufy how they can be applied to release 4 if
>>>>> you
>>>>> really want to use it... however you should really think to use the
>>>>> trunk
>>>>>
>>>>>
>>>>> On Jul 10, 2008, at 11:08 PM, nico61 wrote:
>>>>>
>>>>>>
>>>>>> Hi,
>>>>>>
>>>>>> I have create a set of Facility, one of them is used to receive  
>>>>>> raw
>>>>>> material, the second is used to manufacture product
>>>>>> and the last to ship products.
>>>>>>
>>>>>> So, I created a Facility Groups to which I assigned the three
>>>>>> facilities,
>>>>>> giving respectively a progressive sequence number.
>>>>>> Then I execute a MRP session giving as input only the Facility  
>>>>>> Group
>>>>>> item.
>>>>>>
>>>>>> Thank very much
>>>>>> Nico
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>> Jacopo Cappellato-3 wrote:
>>>>>>>
>>>>>>> how is your facility group setup?
>>>>>>>
>>>>>>> Jacopo
>>>>>>>
>>>>>>> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
>>>>>>>
>>>>>>>>
>>>>>>>> I'm trying to execute a MRP session using a Facility Group  
>>>>>>>> instead
>>>>>>>> of a
>>>>>>>> Facility, but the system returns to me the following error
>>>>>>>> "facilityId and
>>>>>>>> manufacturingFacilityId cannot be null".
>>>>>>>>
>>>>>>>> Regards
>>>>>>>> Nico
>>>>>>>> -- 
>>>>>>>> View this message in context:
>>>>>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>>>>>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>
>>>>>> -- 
>>>>>> View this message in context:
>>>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
>>>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>>>
>>>>>
>>>>>
>>>>>
>>>>>
>>>>
>>>> -- 
>>>> View this message in context:
>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399146.html
>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>
>>>
>>>
>>>
>>>
>>
>> -- 
>> View this message in context:
>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399700.html
>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>
> 
> 
>  
> 

-- 
View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18441037.html
Sent from the OFBiz - User mailing list archive at Nabble.com.


Re: MRP using Facility Group

Posted by Jacopo Cappellato <ja...@gmail.com>.
how is the BOM of the door setup?

Jacopo

On Jul 11, 2008, at 11:07 AM, nico61 wrote:

>
> in this way, I obtain a third "Proposed Purchase Order with a  
> quantity = 10"
> for the door and
> I need to have a requirement for manufacturing orders for the door  
> in the
> PLANT ....
>
> Nico
>
>
>
> Jacopo Cappellato-3 wrote:
>>
>> Just try to set the inventory settings for the "door" into the
>> WAREHOUSE and not into the PLANT.
>>
>> WAREHOUSE:
>>> door
>>> Product type = Configurable good
>>> ATP=QOH=OQ = 0
>>> Minimum Stock = 10
>>
>> Jacopo
>>
>>
>> On Jul 11, 2008, at 10:34 AM, nico61 wrote:
>>
>>>
>>> Hi Jacopo,
>>>
>>> my current trunk version is 672765. I already used your suggestion  
>>> and
>>> configured
>>> a facility as WAREHOUSE and the other as PLANT as follows:
>>>
>>> facility associated as WAREHOUSE
>>>
>>> Aluminum Door Handles, Plastic Door Handles and Hardboard Door  
>>> anyone
>>> configured as:
>>> Product type = Finished good
>>> ATP=QOH=OQ = 0
>>> Minimum Stock = 10
>>>
>>> facility associated as PLANT
>>>
>>> door
>>> Product type = Configurable good
>>> ATP=QOH=OQ = 0
>>> Minimum Stock = 10
>>>
>>> I executed the MRP and reached the following results:
>>>
>>> Aluminum Door Handles
>>> Facility: 10030
>>> Minimum Stock: 10
>>> Proposed Purchase Order with a quantity = 10
>>>
>>> Plastic Door Handles
>>> Facility: 10030
>>> Minimum Stock: 10
>>> Proposed Purchase Order with a quantity = 10
>>>
>>> Hardboard Door
>>> Facility: 10030
>>> Minimum Stock: 10
>>> Proposed Purchase Order with a quantity = 10
>>>
>>> but no requirements for manufacturing orders concerning the product
>>> door
>>> ....
>>>
>>> Is my mistake the door product type ? I also used another type as
>>> Finished
>>> good, even if is not my
>>> goal, but I reached the same result .......
>>>
>>> thanks
>>> Nico
>>>
>>>
>>> Jacopo Cappellato-3 wrote:
>>>>
>>>> Hi Nico,
>>>>
>>>> in its current (pretty basic) implementation of the facility group
>>>> support, you have to create a facility group:
>>>> * with a facility associated as WAREHOUSE: used by the MRP for
>>>> inventory levels
>>>> * and with a facility associated as PLANT: used by the MRP when it
>>>> generates requirements for manufacturing orders
>>>>
>>>> If you need something more complex you'll have to enhance the code
>>>> (MrpServices.java, around lines 610-650)
>>>>
>>>> Jacopo
>>>>
>>>> PS: the above suggestions are for the TRUNK version, not the  
>>>> release
>>>> 4... you'll have to verufy how they can be applied to release 4 if
>>>> you
>>>> really want to use it... however you should really think to use the
>>>> trunk
>>>>
>>>>
>>>> On Jul 10, 2008, at 11:08 PM, nico61 wrote:
>>>>
>>>>>
>>>>> Hi,
>>>>>
>>>>> I have create a set of Facility, one of them is used to receive  
>>>>> raw
>>>>> material, the second is used to manufacture product
>>>>> and the last to ship products.
>>>>>
>>>>> So, I created a Facility Groups to which I assigned the three
>>>>> facilities,
>>>>> giving respectively a progressive sequence number.
>>>>> Then I execute a MRP session giving as input only the Facility  
>>>>> Group
>>>>> item.
>>>>>
>>>>> Thank very much
>>>>> Nico
>>>>>
>>>>>
>>>>>
>>>>>
>>>>> Jacopo Cappellato-3 wrote:
>>>>>>
>>>>>> how is your facility group setup?
>>>>>>
>>>>>> Jacopo
>>>>>>
>>>>>> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
>>>>>>
>>>>>>>
>>>>>>> I'm trying to execute a MRP session using a Facility Group  
>>>>>>> instead
>>>>>>> of a
>>>>>>> Facility, but the system returns to me the following error
>>>>>>> "facilityId and
>>>>>>> manufacturingFacilityId cannot be null".
>>>>>>>
>>>>>>> Regards
>>>>>>> Nico
>>>>>>> -- 
>>>>>>> View this message in context:
>>>>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>>>>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>
>>>>> -- 
>>>>> View this message in context:
>>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
>>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>>
>>>>
>>>>
>>>>
>>>>
>>>
>>> -- 
>>> View this message in context:
>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399146.html
>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>
>>
>>
>>
>>
>
> -- 
> View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399700.html
> Sent from the OFBiz - User mailing list archive at Nabble.com.
>


Re: MRP using Facility Group

Posted by nico61 <ni...@libero.it>.
in this way, I obtain a third "Proposed Purchase Order with a quantity = 10"
for the door and
I need to have a requirement for manufacturing orders for the door in the
PLANT ....

Nico



Jacopo Cappellato-3 wrote:
> 
> Just try to set the inventory settings for the "door" into the  
> WAREHOUSE and not into the PLANT.
> 
> WAREHOUSE:
>> door
>> Product type = Configurable good
>> ATP=QOH=OQ = 0
>> Minimum Stock = 10
> 
> Jacopo
> 
> 
> On Jul 11, 2008, at 10:34 AM, nico61 wrote:
> 
>>
>> Hi Jacopo,
>>
>> my current trunk version is 672765. I already used your suggestion and
>> configured
>> a facility as WAREHOUSE and the other as PLANT as follows:
>>
>> facility associated as WAREHOUSE
>>
>> Aluminum Door Handles, Plastic Door Handles and Hardboard Door anyone
>> configured as:
>> Product type = Finished good
>> ATP=QOH=OQ = 0
>> Minimum Stock = 10
>>
>> facility associated as PLANT
>>
>> door
>> Product type = Configurable good
>> ATP=QOH=OQ = 0
>> Minimum Stock = 10
>>
>> I executed the MRP and reached the following results:
>>
>> Aluminum Door Handles
>> Facility: 10030
>> Minimum Stock: 10
>> Proposed Purchase Order with a quantity = 10
>>
>> Plastic Door Handles
>> Facility: 10030
>> Minimum Stock: 10
>> Proposed Purchase Order with a quantity = 10
>>
>> Hardboard Door
>> Facility: 10030
>> Minimum Stock: 10
>> Proposed Purchase Order with a quantity = 10
>>
>> but no requirements for manufacturing orders concerning the product  
>> door
>> ....
>>
>> Is my mistake the door product type ? I also used another type as  
>> Finished
>> good, even if is not my
>> goal, but I reached the same result .......
>>
>> thanks
>> Nico
>>
>>
>> Jacopo Cappellato-3 wrote:
>>>
>>> Hi Nico,
>>>
>>> in its current (pretty basic) implementation of the facility group
>>> support, you have to create a facility group:
>>> * with a facility associated as WAREHOUSE: used by the MRP for
>>> inventory levels
>>> * and with a facility associated as PLANT: used by the MRP when it
>>> generates requirements for manufacturing orders
>>>
>>> If you need something more complex you'll have to enhance the code
>>> (MrpServices.java, around lines 610-650)
>>>
>>> Jacopo
>>>
>>> PS: the above suggestions are for the TRUNK version, not the release
>>> 4... you'll have to verufy how they can be applied to release 4 if  
>>> you
>>> really want to use it... however you should really think to use the
>>> trunk
>>>
>>>
>>> On Jul 10, 2008, at 11:08 PM, nico61 wrote:
>>>
>>>>
>>>> Hi,
>>>>
>>>> I have create a set of Facility, one of them is used to receive raw
>>>> material, the second is used to manufacture product
>>>> and the last to ship products.
>>>>
>>>> So, I created a Facility Groups to which I assigned the three
>>>> facilities,
>>>> giving respectively a progressive sequence number.
>>>> Then I execute a MRP session giving as input only the Facility Group
>>>> item.
>>>>
>>>> Thank very much
>>>> Nico
>>>>
>>>>
>>>>
>>>>
>>>> Jacopo Cappellato-3 wrote:
>>>>>
>>>>> how is your facility group setup?
>>>>>
>>>>> Jacopo
>>>>>
>>>>> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
>>>>>
>>>>>>
>>>>>> I'm trying to execute a MRP session using a Facility Group instead
>>>>>> of a
>>>>>> Facility, but the system returns to me the following error
>>>>>> "facilityId and
>>>>>> manufacturingFacilityId cannot be null".
>>>>>>
>>>>>> Regards
>>>>>> Nico
>>>>>> -- 
>>>>>> View this message in context:
>>>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>>>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>>>
>>>>>
>>>>>
>>>>>
>>>>>
>>>>
>>>> -- 
>>>> View this message in context:
>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>
>>>
>>>
>>>
>>>
>>
>> -- 
>> View this message in context:
>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399146.html
>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>
> 
> 
>  
> 

-- 
View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399700.html
Sent from the OFBiz - User mailing list archive at Nabble.com.


Re: MRP using Facility Group

Posted by Jacopo Cappellato <ja...@gmail.com>.
Just try to set the inventory settings for the "door" into the  
WAREHOUSE and not into the PLANT.

WAREHOUSE:
> door
> Product type = Configurable good
> ATP=QOH=OQ = 0
> Minimum Stock = 10

Jacopo


On Jul 11, 2008, at 10:34 AM, nico61 wrote:

>
> Hi Jacopo,
>
> my current trunk version is 672765. I already used your suggestion and
> configured
> a facility as WAREHOUSE and the other as PLANT as follows:
>
> facility associated as WAREHOUSE
>
> Aluminum Door Handles, Plastic Door Handles and Hardboard Door anyone
> configured as:
> Product type = Finished good
> ATP=QOH=OQ = 0
> Minimum Stock = 10
>
> facility associated as PLANT
>
> door
> Product type = Configurable good
> ATP=QOH=OQ = 0
> Minimum Stock = 10
>
> I executed the MRP and reached the following results:
>
> Aluminum Door Handles
> Facility: 10030
> Minimum Stock: 10
> Proposed Purchase Order with a quantity = 10
>
> Plastic Door Handles
> Facility: 10030
> Minimum Stock: 10
> Proposed Purchase Order with a quantity = 10
>
> Hardboard Door
> Facility: 10030
> Minimum Stock: 10
> Proposed Purchase Order with a quantity = 10
>
> but no requirements for manufacturing orders concerning the product  
> door
> ....
>
> Is my mistake the door product type ? I also used another type as  
> Finished
> good, even if is not my
> goal, but I reached the same result .......
>
> thanks
> Nico
>
>
> Jacopo Cappellato-3 wrote:
>>
>> Hi Nico,
>>
>> in its current (pretty basic) implementation of the facility group
>> support, you have to create a facility group:
>> * with a facility associated as WAREHOUSE: used by the MRP for
>> inventory levels
>> * and with a facility associated as PLANT: used by the MRP when it
>> generates requirements for manufacturing orders
>>
>> If you need something more complex you'll have to enhance the code
>> (MrpServices.java, around lines 610-650)
>>
>> Jacopo
>>
>> PS: the above suggestions are for the TRUNK version, not the release
>> 4... you'll have to verufy how they can be applied to release 4 if  
>> you
>> really want to use it... however you should really think to use the
>> trunk
>>
>>
>> On Jul 10, 2008, at 11:08 PM, nico61 wrote:
>>
>>>
>>> Hi,
>>>
>>> I have create a set of Facility, one of them is used to receive raw
>>> material, the second is used to manufacture product
>>> and the last to ship products.
>>>
>>> So, I created a Facility Groups to which I assigned the three
>>> facilities,
>>> giving respectively a progressive sequence number.
>>> Then I execute a MRP session giving as input only the Facility Group
>>> item.
>>>
>>> Thank very much
>>> Nico
>>>
>>>
>>>
>>>
>>> Jacopo Cappellato-3 wrote:
>>>>
>>>> how is your facility group setup?
>>>>
>>>> Jacopo
>>>>
>>>> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
>>>>
>>>>>
>>>>> I'm trying to execute a MRP session using a Facility Group instead
>>>>> of a
>>>>> Facility, but the system returns to me the following error
>>>>> "facilityId and
>>>>> manufacturingFacilityId cannot be null".
>>>>>
>>>>> Regards
>>>>> Nico
>>>>> -- 
>>>>> View this message in context:
>>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>>
>>>>
>>>>
>>>>
>>>>
>>>
>>> -- 
>>> View this message in context:
>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>
>>
>>
>>
>>
>
> -- 
> View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399146.html
> Sent from the OFBiz - User mailing list archive at Nabble.com.
>


Re: MRP using Facility Group

Posted by nico61 <ni...@libero.it>.
Hi Jacopo, 

my current trunk version is 672765. I already used your suggestion and
configured 
a facility as WAREHOUSE and the other as PLANT as follows:

facility associated as WAREHOUSE

Aluminum Door Handles, Plastic Door Handles and Hardboard Door anyone
configured as:
Product type = Finished good
ATP=QOH=OQ = 0
Minimum Stock = 10

facility associated as PLANT

door
Product type = Configurable good
ATP=QOH=OQ = 0
Minimum Stock = 10

I executed the MRP and reached the following results:

Aluminum Door Handles
Facility: 10030
Minimum Stock: 10
Proposed Purchase Order with a quantity = 10

Plastic Door Handles
Facility: 10030
Minimum Stock: 10
Proposed Purchase Order with a quantity = 10

Hardboard Door
Facility: 10030
Minimum Stock: 10
Proposed Purchase Order with a quantity = 10

but no requirements for manufacturing orders concerning the product door
....

Is my mistake the door product type ? I also used another type as Finished
good, even if is not my
goal, but I reached the same result .......
 
thanks
Nico


Jacopo Cappellato-3 wrote:
> 
> Hi Nico,
> 
> in its current (pretty basic) implementation of the facility group  
> support, you have to create a facility group:
> * with a facility associated as WAREHOUSE: used by the MRP for  
> inventory levels
> * and with a facility associated as PLANT: used by the MRP when it  
> generates requirements for manufacturing orders
> 
> If you need something more complex you'll have to enhance the code  
> (MrpServices.java, around lines 610-650)
> 
> Jacopo
> 
> PS: the above suggestions are for the TRUNK version, not the release  
> 4... you'll have to verufy how they can be applied to release 4 if you  
> really want to use it... however you should really think to use the  
> trunk
> 
> 
> On Jul 10, 2008, at 11:08 PM, nico61 wrote:
> 
>>
>> Hi,
>>
>> I have create a set of Facility, one of them is used to receive raw
>> material, the second is used to manufacture product
>> and the last to ship products.
>>
>> So, I created a Facility Groups to which I assigned the three  
>> facilities,
>> giving respectively a progressive sequence number.
>> Then I execute a MRP session giving as input only the Facility Group  
>> item.
>>
>> Thank very much
>> Nico
>>
>>
>>
>>
>> Jacopo Cappellato-3 wrote:
>>>
>>> how is your facility group setup?
>>>
>>> Jacopo
>>>
>>> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
>>>
>>>>
>>>> I'm trying to execute a MRP session using a Facility Group instead
>>>> of a
>>>> Facility, but the system returns to me the following error
>>>> "facilityId and
>>>> manufacturingFacilityId cannot be null".
>>>>
>>>> Regards
>>>> Nico
>>>> -- 
>>>> View this message in context:
>>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>>
>>>
>>>
>>>
>>>
>>
>> -- 
>> View this message in context:
>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>
> 
> 
>  
> 

-- 
View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18399146.html
Sent from the OFBiz - User mailing list archive at Nabble.com.


Re: MRP using Facility Group

Posted by Jacopo Cappellato <ja...@gmail.com>.
Hi Nico,

in its current (pretty basic) implementation of the facility group  
support, you have to create a facility group:
* with a facility associated as WAREHOUSE: used by the MRP for  
inventory levels
* and with a facility associated as PLANT: used by the MRP when it  
generates requirements for manufacturing orders

If you need something more complex you'll have to enhance the code  
(MrpServices.java, around lines 610-650)

Jacopo

PS: the above suggestions are for the TRUNK version, not the release  
4... you'll have to verufy how they can be applied to release 4 if you  
really want to use it... however you should really think to use the  
trunk


On Jul 10, 2008, at 11:08 PM, nico61 wrote:

>
> Hi,
>
> I have create a set of Facility, one of them is used to receive raw
> material, the second is used to manufacture product
> and the last to ship products.
>
> So, I created a Facility Groups to which I assigned the three  
> facilities,
> giving respectively a progressive sequence number.
> Then I execute a MRP session giving as input only the Facility Group  
> item.
>
> Thank very much
> Nico
>
>
>
>
> Jacopo Cappellato-3 wrote:
>>
>> how is your facility group setup?
>>
>> Jacopo
>>
>> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
>>
>>>
>>> I'm trying to execute a MRP session using a Facility Group instead
>>> of a
>>> Facility, but the system returns to me the following error
>>> "facilityId and
>>> manufacturingFacilityId cannot be null".
>>>
>>> Regards
>>> Nico
>>> -- 
>>> View this message in context:
>>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>>
>>
>>
>>
>>
>
> -- 
> View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
> Sent from the OFBiz - User mailing list archive at Nabble.com.
>


Re: MRP using Facility Group

Posted by nico61 <ni...@libero.it>.
Hi,

I have create a set of Facility, one of them is used to receive raw
material, the second is used to manufacture product 
and the last to ship products.

So, I created a Facility Groups to which I assigned the three facilities,
giving respectively a progressive sequence number.
Then I execute a MRP session giving as input only the Facility Group item.

Thank very much
Nico




Jacopo Cappellato-3 wrote:
> 
> how is your facility group setup?
> 
> Jacopo
> 
> On Jul 10, 2008, at 5:40 PM, nico61 wrote:
> 
>>
>> I'm trying to execute a MRP session using a Facility Group instead  
>> of a
>> Facility, but the system returns to me the following error  
>> "facilityId and
>> manufacturingFacilityId cannot be null".
>>
>> Regards
>> Nico
>> -- 
>> View this message in context:
>> http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
>> Sent from the OFBiz - User mailing list archive at Nabble.com.
>>
> 
> 
>  
> 

-- 
View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18391935.html
Sent from the OFBiz - User mailing list archive at Nabble.com.


Re: MRP using Facility Group

Posted by Jacopo Cappellato <ja...@gmail.com>.
how is your facility group setup?

Jacopo

On Jul 10, 2008, at 5:40 PM, nico61 wrote:

>
> I'm trying to execute a MRP session using a Facility Group instead  
> of a
> Facility, but the system returns to me the following error  
> "facilityId and
> manufacturingFacilityId cannot be null".
>
> Regards
> Nico
> -- 
> View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18385564.html
> Sent from the OFBiz - User mailing list archive at Nabble.com.
>


Re: MRP using Facility Group

Posted by nico61 <ni...@libero.it>.
Hi,

I'm using 4.0 SVN version. Concernig the occured error, I list the relatve
log file:

2008-07-10 23:15:11,687 (default-invoker-Thread-1328)
[PersistedServiceJob.java:141:INFO ]
org.ofbiz.service.job.PersistedServiceJob@5ac214[15332] -- Next runtime: -1
2008-07-10 23:15:11,687 (default-invoker-Thread-1328) [
UtilXml.java:241:INFO ] XML Read 0.0s: Internal Content
2008-07-10 23:15:11,687 (default-invoker-Thread-1328) [
MrpServices.java:599:INFO ] executeMrp called
2008-07-10 23:15:11,703 (default-invoker-Thread-1328) [
ServiceDispatcher.java:522:ERROR] Error in Service [executeMrp]: facilityId
and manufacturingFacilityId cannot be null
2008-07-10 23:15:11,703 (default-invoker-Thread-1328) [
TransactionUtil.java:275:ERROR] ---- exception report
----------------------------------------------------------
[TransactionUtil.rollback] Exception: java.lang.Exception Message: Stack
Trace ---- stack trace
---------------------------------------------------------------
java.lang.Exception: Stack Trace
org.ofbiz.entity.transaction.TransactionUtil.rollback(TransactionUtil.java:274)
org.ofbiz.entity.transaction.TransactionUtil.rollback(TransactionUtil.java:256)
org.ofbiz.service.ServiceDispatcher.runSync(ServiceDispatcher.java:526)
org.ofbiz.service.ServiceDispatcher.runSync(ServiceDispatcher.java:213)
org.ofbiz.service.GenericDispatcher.runSync(GenericDispatcher.java:149)
org.ofbiz.service.job.GenericServiceJob.exec(GenericServiceJob.java:69)
org.ofbiz.service.job.JobInvoker.run(JobInvoker.java:240)
java.lang.Thread.run(Thread.java:619)
--------------------------------------------------------------------------------
2008-07-10 23:15:11,703 (default-invoker-Thread-1328) [
TransactionUtil.java:285:INFO ] [TransactionUtil.rollback] transaction
rolled back
2008-07-10 23:15:11,703 (default-invoker-Thread-1328) [
GenericServiceJob.java:116:ERROR] ---- exception report
---------------------------------------------------------- Async-Service
failed. Exception: java.lang.Exception Message: facilityId and
manufacturingFacilityId cannot be null ---- stack trace
---------------------------------------------------------------
java.lang.Exception: facilityId and manufacturingFacilityId cannot be null
org.ofbiz.service.job.GenericServiceJob.exec(GenericServiceJob.java:75)
org.ofbiz.service.job.JobInvoker.run(JobInvoker.java:240)
java.lang.Thread.run(Thread.java:619)
--------------------------------------------------------------------------------
2008-07-10 23:15:11,703 (default-invoker-Thread-1328)
[PersistedServiceJob.java:208:WARN ] Persisted Job [15332] Failed - Max
Retry Hit; not re-scheduling 


Thanks,
Nico



BJ Freeman wrote:
> 
> can you provide more info
> the url or service you used.
> the SVN version you are using?
> log files
> 
> nico61 sent the following on 7/10/2008 8:40 AM:
>> I'm trying to execute a MRP session using a Facility Group instead of a
>> Facility, but the system returns to me the following error "facilityId
>> and
>> manufacturingFacilityId cannot be null". 
>>  
>> Regards  
>> Nico 
> 
> 
> 

-- 
View this message in context: http://www.nabble.com/MRP-using-Facility-Group-tp18385564p18392293.html
Sent from the OFBiz - User mailing list archive at Nabble.com.


Re: MRP using Facility Group

Posted by BJ Freeman <bj...@free-man.net>.
can you provide more info
the url or service you used.
the SVN version you are using?
log files

nico61 sent the following on 7/10/2008 8:40 AM:
> I'm trying to execute a MRP session using a Facility Group instead of a
> Facility, but the system returns to me the following error "facilityId and
> manufacturingFacilityId cannot be null". 
>  
> Regards  
> Nico