You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "lining (Jira)" <ji...@apache.org> on 2019/11/13 09:14:00 UTC
[jira] [Created] (FLINK-14738) Job which status is finished, get
operator metric
lining created FLINK-14738:
------------------------------
Summary: Job which status is finished, get operator metric
Key: FLINK-14738
URL: https://issues.apache.org/jira/browse/FLINK-14738
Project: Flink
Issue Type: Wish
Components: Runtime / Metrics
Reporter: lining
When job is runing, we could get operator metric. But when it's finished, just get task record num. If there any way could get any operator's metricsĀ
--
This message was sent by Atlassian Jira
(v8.3.4#803005)