You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@jmeter.apache.org by bu...@apache.org on 2016/10/24 06:50:01 UTC
[Bug 60299] New: Thread Group - Scheduler - Thread groups start,
when setting End-Time is in the past.
https://bz.apache.org/bugzilla/show_bug.cgi?id=60299
Bug ID: 60299
Summary: Thread Group - Scheduler - Thread groups start, when
setting End-Time is in the past.
Product: JMeter
Version: 3.0
Hardware: All
OS: All
Status: NEW
Severity: major
Priority: P2
Component: Main
Assignee: issues@jmeter.apache.org
Reporter: ASF.Software.Timo@Leefers.eu
Settings in the Thread-Group:
Sheduler: The Start-Time and End-Time are in the past.
Now starting the Load-Test: JMeter direct starts the load-test and starts all
Thread within the Ramp-Up Time. Every Thread will run exact one time and then
end working.
But this behavior is not what I expected.
I think tow options would be correct:
1.) Is at least one of the date in the past (Or End-Time is before Start-Time)
JMeter shows an error dialog. With a message like: "Start-Time and / or
End-Time of Scheduler <Name of Scheduler> are in the past. Please check this
values!\Test aborted.".
2.) No Thread would be started, because no thread is allowd to started after
End-Time.
IMHO: I would prefer the first option!
--
You are receiving this mail because:
You are the assignee for the bug.
[Bug 60299] Thread Group with Scheduler : Weird behaviour when
End-Time is in the past
Posted by bu...@apache.org.
https://bz.apache.org/bugzilla/show_bug.cgi?id=60299
Philippe Mouawad <p....@ubik-ingenierie.com> changed:
What |Removed |Added
----------------------------------------------------------------------------
CC| |p.mouawad@ubik-ingenierie.c
| |om
Summary|Thread Group - Scheduler - |Thread Group with Scheduler
|Thread groups start, when |: Weird behaviour when
|setting End-Time is in the |End-Time is in the past
|past. |
--
You are receiving this mail because:
You are the assignee for the bug.
[Bug 60299] Thread Group with Scheduler : Weird behaviour when
End-Time is in the past
Posted by bu...@apache.org.
https://bz.apache.org/bugzilla/show_bug.cgi?id=60299
Timo <AS...@Leefers.eu> changed:
What |Removed |Added
----------------------------------------------------------------------------
Status|RESOLVED |CLOSED
--- Comment #2 from Timo <AS...@Leefers.eu> ---
I've retested the behavoir.
Thank you for fixing this bug.
--
You are receiving this mail because:
You are the assignee for the bug.
[Bug 60299] Thread Group with Scheduler : Weird behaviour when
End-Time is in the past
Posted by bu...@apache.org.
https://bz.apache.org/bugzilla/show_bug.cgi?id=60299
Philippe Mouawad <p....@ubik-ingenierie.com> changed:
What |Removed |Added
----------------------------------------------------------------------------
Resolution|--- |FIXED
Status|NEW |RESOLVED
--- Comment #1 from Philippe Mouawad <p....@ubik-ingenierie.com> ---
Author: pmouawad
Date: Sat Nov 12 21:26:36 2016
New Revision: 1769429
URL: http://svn.apache.org/viewvc?rev=1769429&view=rev
Log:
Bug 60299 - Thread Group with Scheduler : Weird behaviour when End-Time is in
the past
Bugzilla Id: 60299
Modified:
jmeter/trunk/src/core/org/apache/jmeter/threads/ThreadGroup.java
jmeter/trunk/xdocs/changes.xml
--
You are receiving this mail because:
You are the assignee for the bug.