You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@accumulo.apache.org by "Christopher Tubbs (JIRA)" <ji...@apache.org> on 2013/04/13 00:44:15 UTC
[jira] [Updated] (ACCUMULO-1202) Add integration-test phase to
maven build by using maven-failsafe-plugin
[ https://issues.apache.org/jira/browse/ACCUMULO-1202?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Christopher Tubbs updated ACCUMULO-1202:
----------------------------------------
Fix Version/s: 1.5.0
> Add integration-test phase to maven build by using maven-failsafe-plugin
> ------------------------------------------------------------------------
>
> Key: ACCUMULO-1202
> URL: https://issues.apache.org/jira/browse/ACCUMULO-1202
> Project: Accumulo
> Issue Type: Improvement
> Affects Versions: 1.6.0
> Reporter: David Medinets
> Fix For: 1.5.0
>
>
> On my VirtualBox Ubuntu server, the tests take six minutes to run. Let's add the failsafe plugin so that we can move the long-running tests to the integration-test phase. See http://antoniogoncalves.org/2012/12/13/lets-turn-integration-tests-with-maven-to-a-first-class-citizen/ for details how to change the pom.xml. Renaming ShellServerTest and TestProxyTableOperations to end in IT would reduce the test execution time by about 50% on my server.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira