You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@maven.apache.org by "Robert Scholte (JIRA)" <ji...@apache.org> on 2016/07/12 20:35:20 UTC

[jira] [Closed] (MNG-6062) post-integration-test phase is executed for goal integration-test

     [ https://issues.apache.org/jira/browse/MNG-6062?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Robert Scholte closed MNG-6062.
-------------------------------
    Resolution: Duplicate
      Assignee: Robert Scholte

It works as designed: run the lifecycle up to the specified phase. However, MNG-5668 contains a proposal to improve this.

> post-integration-test phase is executed for goal integration-test
> -----------------------------------------------------------------
>
>                 Key: MNG-6062
>                 URL: https://issues.apache.org/jira/browse/MNG-6062
>             Project: Maven
>          Issue Type: Bug
>          Components: core
>    Affects Versions: 3.2.3, 3.3.9
>         Environment: Linux Mint 17, OpenJDK Runtime Environment (IcedTea 2.6.6) (7u101-2.6.6-0ubuntu0.14.04.1), IDE Netbeans v8.02, also reproduced with command line
>            Reporter: Eiko Thomas
>            Assignee: Robert Scholte
>
> I have configured different plugins for 'pre-integration-test' and 'post-integration-test'. Every time I call 'mvn integration-test' only the pre-integration-test actions are executed. When I call 'mvn verify' the actions for the pre and the post phases are execute.
> I can reproduce this behaviour with activated failsafe-plugin and without. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)