Heya Justine,

Sure, I will include it in the release plan! Let me know if you encounter issues with implementation or reviews!

Best,
Christo

> On 30 Oct 2025, at 16:27, Justine Olshan <jo...@confluent.io.invalid> wrote:
> 
> Hey Christo
> I was wondering if we could include KIP-1228 in the 4.2 release. We have
> the required votes -- we just didn't officially close the vote yet.
> I think we should also be able to implement it in time for the feature
> freeze. What do you think?
> 
> Thanks,
> Justine
> 
>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <ch...@gmail.com>
>> wrote:
>> 
>> Hello!
>> 
>> We have now passed the KIP freeze date for 4.2.0. The next goal is the
>> feature freeze on the 19th of November!
>> 
>> Feel free to reachout on this thread if your changes are not getting
>> traction to meet that date!
>> 
>> Best,
>> Christo
>> 
>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <ch...@gmail.com>
>>> wrote:
>>> 
>>> Hello!
>>> 
>>> This is to bump the 4.2.0 thread to the top of the mailing list!
>>> 
>>> The KIP freeze date is 1 week from today on the 29th of October.
>>> Please ensure that you have the required number of binding votes for
>>> your KIP by that date if you would like it included in 4.2.0.
>>> 
>>> Best,
>>> Christo
>>> 
>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <mi...@gmail.com>
>> wrote:
>>>> 
>>>> Hi,
>>>> 
>>>> I think moving code freeze to December 10 makes sense.
>>>> Many people will be off the last 2 weeks of December, so it's best to
>>>> not have deadlines then.
>>>> 
>>>> Thanks,
>>>> Mickael
>>>> 
>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <ch...@gmail.com>
>> wrote:
>>>>> 
>>>>> Hello!
>>>>> 
>>>>> Thanks for the review!
>>>>> 
>>>>> I am okay with pulling all dates by 2 weeks earlier in time (barring
>> the
>>>>> 7th of January one). If there are no objections to the new dates I
>> will
>>>>> update them in the plan tomorrow!
>>>>> 
>>>>> Best,
>>>>> Christo
>>>>> 
>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com> wrote:
>>>>> 
>>>>>> Hi Christo,
>>>>>> 
>>>>>> Thanks for managing the release and for the proposed release plan.
>>>>>> 
>>>>>> Given our desire to ship every 4 months, I think the proposed
>> dates should
>>>>>> be shifted a bit. The original plan was for 4.1 to ship in mid
>> July and for
>>>>>> 4.2 to ship in mid November. The former eventually shipped on
>> September 2nd
>>>>>> and with the current plan would probably result in 4.2 shipping in
>> late
>>>>>> January/early February. Given where we are, I would suggest
>> something like:
>>>>>> 
>>>>>> KIP Freeze: October 29 (Wednesday)
>>>>>> Feature Freeze: November 19 (Wednesday)
>>>>>> Code Freeze: December 10 (Wednesday)
>>>>>> At least four weeks of stabilization will follow Code Freeze
>> (taking
>>>>>> holidays into account), meaning we expect to release no earlier
>> than
>>>>>> January 7 2026.
>>>>>> 
>>>>>> Ideally, we'd get RC0 out before the holiday break and then
>> complete the
>>>>>> release by early/mid January.
>>>>>> 
>>>>>> Thoughts?
>>>>>> 
>>>>>> Ismael
>>>>>> 
>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
>> christololov@gmail.com>
>>>>>> wrote:
>>>>>> 
>>>>>>> Hello!
>>>>>>> 
>>>>>>> I would like to volunteer to be the release manager for the
>> Apache Kafka
>>>>>>> 4.2.0 release.
>>>>>>> 
>>>>>>> If no one has any objections, you can find a proposed release
>> plan at
>>>>>>> 
>> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
>>>>>>> 
>>>>>>> Thanks,
>>>>>>> Christo
>>>>>>> 
>>>>>> 
>> 

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Manikumar <ma...@gmail.com>.
Hi Christo,

I noticed that KIP-1157 was completed but not added to the release plan, so
I’ve added it.

Thanks,
Manikumar

On Thu, Nov 20, 2025 at 5:23 PM Christo Lolov <ch...@gmail.com>
wrote:

> Hello,
>
> My last email didn't send :(
>
> Thanks Lukas and David, noted!
>
> Yeah, Andrew, no problem, I can wait for a day :). Let me know if
> something else pops up!
>
> Best,
> Christo
>
> On Wed, 19 Nov 2025 at 23:21, Andrew Schofield <sc...@apache.org>
> wrote:
> >
> > Hi Christo,
> > I'd like to give an update on progress for KIP-932 and KIP-1226. Today
> has been challenging because of build failures on account of an OOM in the
> client unit tests. We have now identified the troublesome commit and just
> merged a fix.
> >
> > PRs for 3 of the remaining 5 subtasks for KIP-932 (
> https://issues.apache.org/jira/browse/KAFKA-16092) are ready but the
> build problems thwarted their completion. This is one code fix, a PR to
> mark interfaces as stable, and documentation. That leaves 1 subtask (
> https://issues.apache.org/jira/browse/KAFKA-17541) which should complete
> this week, and another (https://issues.apache.org/jira/browse/KAFKA-19865)
> which is documenting metrics.
> >
> > The final task for KIP-1226 has an approved PR which again has been
> hampered today by the builds.
> >
> > I wonder whether you could postpone cutting the release branch by one
> day until the morning of 21st. If not, we can cherry-pick, but I thought
> I'd ask.
> >
> > Thanks,
> > Andrew
> >
> > On 2025/11/19 11:28:58 David Jacot wrote:
> > > Hi Chisto,
> > >
> > > I have added KIP-1224 to the release plan because we completed the
> > > implementation.
> > >
> > > Best,
> > > David
> > >
> > > On Wed, Nov 19, 2025 at 11:06 AM Lucas Brutschy
> > > <lb...@confluent.io.invalid> wrote:
> > >
> > > > Hi Christo,
> > > >
> > > > I have added KIP-1071 to the release plan. After EA in 4.1, this
> > > > release will mark GA (stable & production-ready) for a limited
> feature
> > > > set. We will add details to the Kafka Streams upgrade guide.
> > > >
> > > > Thanks,
> > > > Lucas
> > > >
> > > > On Tue, Nov 18, 2025 at 2:44 PM Christo Lolov <
> christololov@gmail.com>
> > > > wrote:
> > > > >
> > > > > Heya Andrew,
> > > > >
> > > > > Thanks a lot for adding the KIPs.
> > > > >
> > > > > On a separate note, tomorrow (19th of November) is the feature
> freeze
> > > > > date. I will wait until the morning of the 20th to cut the release
> > > > > branch and from then on any necessary commits should be
> cherry-picked
> > > > > to that branch.
> > > > >
> > > > > Let me know if the freeze date needs adjustment!
> > > > >
> > > > > Best,
> > > > > Christo
> > > > >
> > > > > On Tue, 18 Nov 2025 at 12:23, Andrew Schofield <
> schofielaj@apache.org>
> > > > wrote:
> > > > > >
> > > > > > Hi Christo,
> > > > > > I've added a few KIPs to the 4.2 release plan.
> > > > > >
> > > > > > KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one
> PR
> > > > still in progress and a few reviews. Documentation will extend past
> the
> > > > feature freeze.
> > > > > > KIP-1226 (Share group lag) is complete apart from one PR for
> > > > integration tests which is under review and almost ready.
> > > > > > KIP-1227 (Expose rack ID in member description) which is
> complete and
> > > > was missing from the list.
> > > > > >
> > > > > > Thanks,
> > > > > > Andrew
> > > > > >
> > > > > > On 2025/11/05 15:12:18 Christo Lolov wrote:
> > > > > > > Heya!
> > > > > > >
> > > > > > > Sure, I will add them to the release plan. Let me know if
> there are
> > > > problems with the implementation!
> > > > > > >
> > > > > > > Best,
> > > > > > > Christo
> > > > > > >
> > > > > > > > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <chia7712@apache.org
> >
> > > > wrote:
> > > > > > > >
> > > > > > > > hi Christo
> > > > > > > >
> > > > > > > > Could we include KIP-1196 and KIP-1231 in the 4.2 release?
> Their
> > > > implementations are simple, so I believe they can be completed in
> time for
> > > > the feature freeze.
> > > > > > > >
> > > > > > > > Best,
> > > > > > > > Chia-Ping
> > > > > > > >
> > > > > > > >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> > > > > > > >> Heya Justine,
> > > > > > > >>
> > > > > > > >> Sure, I will include it in the release plan! Let me know if
> you
> > > > encounter issues with implementation or reviews!
> > > > > > > >>
> > > > > > > >> Best,
> > > > > > > >> Christo
> > > > > > > >>
> > > > > > > >>>> On 30 Oct 2025, at 16:27, Justine Olshan
> > > > <jo...@confluent.io.invalid> wrote:
> > > > > > > >>>
> > > > > > > >>> Hey Christo
> > > > > > > >>> I was wondering if we could include KIP-1228 in the 4.2
> release.
> > > > We have
> > > > > > > >>> the required votes -- we just didn't officially close the
> vote
> > > > yet.
> > > > > > > >>> I think we should also be able to implement it in time for
> the
> > > > feature
> > > > > > > >>> freeze. What do you think?
> > > > > > > >>>
> > > > > > > >>> Thanks,
> > > > > > > >>> Justine
> > > > > > > >>>
> > > > > > > >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <
> > > > christololov@gmail.com>
> > > > > > > >>>> wrote:
> > > > > > > >>>>
> > > > > > > >>>> Hello!
> > > > > > > >>>>
> > > > > > > >>>> We have now passed the KIP freeze date for 4.2.0. The
> next goal
> > > > is the
> > > > > > > >>>> feature freeze on the 19th of November!
> > > > > > > >>>>
> > > > > > > >>>> Feel free to reachout on this thread if your changes are
> not
> > > > getting
> > > > > > > >>>> traction to meet that date!
> > > > > > > >>>>
> > > > > > > >>>> Best,
> > > > > > > >>>> Christo
> > > > > > > >>>>
> > > > > > > >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <
> > > > christololov@gmail.com>
> > > > > > > >>>>> wrote:
> > > > > > > >>>>>
> > > > > > > >>>>> Hello!
> > > > > > > >>>>>
> > > > > > > >>>>> This is to bump the 4.2.0 thread to the top of the
> mailing
> > > > list!
> > > > > > > >>>>>
> > > > > > > >>>>> The KIP freeze date is 1 week from today on the 29th of
> > > > October.
> > > > > > > >>>>> Please ensure that you have the required number of
> binding
> > > > votes for
> > > > > > > >>>>> your KIP by that date if you would like it included in
> 4.2.0.
> > > > > > > >>>>>
> > > > > > > >>>>> Best,
> > > > > > > >>>>> Christo
> > > > > > > >>>>>
> > > > > > > >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <
> > > > mickael.maison@gmail.com>
> > > > > > > >>>> wrote:
> > > > > > > >>>>>>
> > > > > > > >>>>>> Hi,
> > > > > > > >>>>>>
> > > > > > > >>>>>> I think moving code freeze to December 10 makes sense.
> > > > > > > >>>>>> Many people will be off the last 2 weeks of December,
> so it's
> > > > best to
> > > > > > > >>>>>> not have deadlines then.
> > > > > > > >>>>>>
> > > > > > > >>>>>> Thanks,
> > > > > > > >>>>>> Mickael
> > > > > > > >>>>>>
> > > > > > > >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <
> > > > christololov@gmail.com>
> > > > > > > >>>> wrote:
> > > > > > > >>>>>>>
> > > > > > > >>>>>>> Hello!
> > > > > > > >>>>>>>
> > > > > > > >>>>>>> Thanks for the review!
> > > > > > > >>>>>>>
> > > > > > > >>>>>>> I am okay with pulling all dates by 2 weeks earlier in
> time
> > > > (barring
> > > > > > > >>>> the
> > > > > > > >>>>>>> 7th of January one). If there are no objections to the
> new
> > > > dates I
> > > > > > > >>>> will
> > > > > > > >>>>>>> update them in the plan tomorrow!
> > > > > > > >>>>>>>
> > > > > > > >>>>>>> Best,
> > > > > > > >>>>>>> Christo
> > > > > > > >>>>>>>
> > > > > > > >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <
> me@ismaeljuma.com>
> > > > wrote:
> > > > > > > >>>>>>>
> > > > > > > >>>>>>>> Hi Christo,
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> Thanks for managing the release and for the proposed
> > > > release plan.
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> Given our desire to ship every 4 months, I think the
> > > > proposed
> > > > > > > >>>> dates should
> > > > > > > >>>>>>>> be shifted a bit. The original plan was for 4.1 to
> ship in
> > > > mid
> > > > > > > >>>> July and for
> > > > > > > >>>>>>>> 4.2 to ship in mid November. The former eventually
> shipped
> > > > on
> > > > > > > >>>> September 2nd
> > > > > > > >>>>>>>> and with the current plan would probably result in 4.2
> > > > shipping in
> > > > > > > >>>> late
> > > > > > > >>>>>>>> January/early February. Given where we are, I would
> suggest
> > > > > > > >>>> something like:
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> KIP Freeze: October 29 (Wednesday)
> > > > > > > >>>>>>>> Feature Freeze: November 19 (Wednesday)
> > > > > > > >>>>>>>> Code Freeze: December 10 (Wednesday)
> > > > > > > >>>>>>>> At least four weeks of stabilization will follow Code
> Freeze
> > > > > > > >>>> (taking
> > > > > > > >>>>>>>> holidays into account), meaning we expect to release
> no
> > > > earlier
> > > > > > > >>>> than
> > > > > > > >>>>>>>> January 7 2026.
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> Ideally, we'd get RC0 out before the holiday break
> and then
> > > > > > > >>>> complete the
> > > > > > > >>>>>>>> release by early/mid January.
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> Thoughts?
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> Ismael
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> > > > > > > >>>> christololov@gmail.com>
> > > > > > > >>>>>>>> wrote:
> > > > > > > >>>>>>>>
> > > > > > > >>>>>>>>> Hello!
> > > > > > > >>>>>>>>>
> > > > > > > >>>>>>>>> I would like to volunteer to be the release manager
> for the
> > > > > > > >>>> Apache Kafka
> > > > > > > >>>>>>>>> 4.2.0 release.
> > > > > > > >>>>>>>>>
> > > > > > > >>>>>>>>> If no one has any objections, you can find a proposed
> > > > release
> > > > > > > >>>> plan at
> > > > > > > >>>>>>>>>
> > > > > > > >>>>
> > > > https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0
> .
> > > > > > > >>>>>>>>>
> > > > > > > >>>>>>>>> Thanks,
> > > > > > > >>>>>>>>> Christo
> > > > > > > >>>>>>>>>
> > > > > > > >>>>>>>>
> > > > > > > >>>>
> > > > > > > >>
> > > > > > >
> > > >
> > >
>

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Christo Lolov <ch...@gmail.com>.
Hello,

My last email didn't send :(

Thanks Lukas and David, noted!

Yeah, Andrew, no problem, I can wait for a day :). Let me know if
something else pops up!

Best,
Christo

On Wed, 19 Nov 2025 at 23:21, Andrew Schofield <sc...@apache.org> wrote:
>
> Hi Christo,
> I'd like to give an update on progress for KIP-932 and KIP-1226. Today has been challenging because of build failures on account of an OOM in the client unit tests. We have now identified the troublesome commit and just merged a fix.
>
> PRs for 3 of the remaining 5 subtasks for KIP-932 (https://issues.apache.org/jira/browse/KAFKA-16092) are ready but the build problems thwarted their completion. This is one code fix, a PR to mark interfaces as stable, and documentation. That leaves 1 subtask (https://issues.apache.org/jira/browse/KAFKA-17541) which should complete this week, and another (https://issues.apache.org/jira/browse/KAFKA-19865) which is documenting metrics.
>
> The final task for KIP-1226 has an approved PR which again has been hampered today by the builds.
>
> I wonder whether you could postpone cutting the release branch by one day until the morning of 21st. If not, we can cherry-pick, but I thought I'd ask.
>
> Thanks,
> Andrew
>
> On 2025/11/19 11:28:58 David Jacot wrote:
> > Hi Chisto,
> >
> > I have added KIP-1224 to the release plan because we completed the
> > implementation.
> >
> > Best,
> > David
> >
> > On Wed, Nov 19, 2025 at 11:06 AM Lucas Brutschy
> > <lb...@confluent.io.invalid> wrote:
> >
> > > Hi Christo,
> > >
> > > I have added KIP-1071 to the release plan. After EA in 4.1, this
> > > release will mark GA (stable & production-ready) for a limited feature
> > > set. We will add details to the Kafka Streams upgrade guide.
> > >
> > > Thanks,
> > > Lucas
> > >
> > > On Tue, Nov 18, 2025 at 2:44 PM Christo Lolov <ch...@gmail.com>
> > > wrote:
> > > >
> > > > Heya Andrew,
> > > >
> > > > Thanks a lot for adding the KIPs.
> > > >
> > > > On a separate note, tomorrow (19th of November) is the feature freeze
> > > > date. I will wait until the morning of the 20th to cut the release
> > > > branch and from then on any necessary commits should be cherry-picked
> > > > to that branch.
> > > >
> > > > Let me know if the freeze date needs adjustment!
> > > >
> > > > Best,
> > > > Christo
> > > >
> > > > On Tue, 18 Nov 2025 at 12:23, Andrew Schofield <sc...@apache.org>
> > > wrote:
> > > > >
> > > > > Hi Christo,
> > > > > I've added a few KIPs to the 4.2 release plan.
> > > > >
> > > > > KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one PR
> > > still in progress and a few reviews. Documentation will extend past the
> > > feature freeze.
> > > > > KIP-1226 (Share group lag) is complete apart from one PR for
> > > integration tests which is under review and almost ready.
> > > > > KIP-1227 (Expose rack ID in member description) which is complete and
> > > was missing from the list.
> > > > >
> > > > > Thanks,
> > > > > Andrew
> > > > >
> > > > > On 2025/11/05 15:12:18 Christo Lolov wrote:
> > > > > > Heya!
> > > > > >
> > > > > > Sure, I will add them to the release plan. Let me know if there are
> > > problems with the implementation!
> > > > > >
> > > > > > Best,
> > > > > > Christo
> > > > > >
> > > > > > > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org>
> > > wrote:
> > > > > > >
> > > > > > > hi Christo
> > > > > > >
> > > > > > > Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their
> > > implementations are simple, so I believe they can be completed in time for
> > > the feature freeze.
> > > > > > >
> > > > > > > Best,
> > > > > > > Chia-Ping
> > > > > > >
> > > > > > >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> > > > > > >> Heya Justine,
> > > > > > >>
> > > > > > >> Sure, I will include it in the release plan! Let me know if you
> > > encounter issues with implementation or reviews!
> > > > > > >>
> > > > > > >> Best,
> > > > > > >> Christo
> > > > > > >>
> > > > > > >>>> On 30 Oct 2025, at 16:27, Justine Olshan
> > > <jo...@confluent.io.invalid> wrote:
> > > > > > >>>
> > > > > > >>> Hey Christo
> > > > > > >>> I was wondering if we could include KIP-1228 in the 4.2 release.
> > > We have
> > > > > > >>> the required votes -- we just didn't officially close the vote
> > > yet.
> > > > > > >>> I think we should also be able to implement it in time for the
> > > feature
> > > > > > >>> freeze. What do you think?
> > > > > > >>>
> > > > > > >>> Thanks,
> > > > > > >>> Justine
> > > > > > >>>
> > > > > > >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <
> > > christololov@gmail.com>
> > > > > > >>>> wrote:
> > > > > > >>>>
> > > > > > >>>> Hello!
> > > > > > >>>>
> > > > > > >>>> We have now passed the KIP freeze date for 4.2.0. The next goal
> > > is the
> > > > > > >>>> feature freeze on the 19th of November!
> > > > > > >>>>
> > > > > > >>>> Feel free to reachout on this thread if your changes are not
> > > getting
> > > > > > >>>> traction to meet that date!
> > > > > > >>>>
> > > > > > >>>> Best,
> > > > > > >>>> Christo
> > > > > > >>>>
> > > > > > >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <
> > > christololov@gmail.com>
> > > > > > >>>>> wrote:
> > > > > > >>>>>
> > > > > > >>>>> Hello!
> > > > > > >>>>>
> > > > > > >>>>> This is to bump the 4.2.0 thread to the top of the mailing
> > > list!
> > > > > > >>>>>
> > > > > > >>>>> The KIP freeze date is 1 week from today on the 29th of
> > > October.
> > > > > > >>>>> Please ensure that you have the required number of binding
> > > votes for
> > > > > > >>>>> your KIP by that date if you would like it included in 4.2.0.
> > > > > > >>>>>
> > > > > > >>>>> Best,
> > > > > > >>>>> Christo
> > > > > > >>>>>
> > > > > > >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <
> > > mickael.maison@gmail.com>
> > > > > > >>>> wrote:
> > > > > > >>>>>>
> > > > > > >>>>>> Hi,
> > > > > > >>>>>>
> > > > > > >>>>>> I think moving code freeze to December 10 makes sense.
> > > > > > >>>>>> Many people will be off the last 2 weeks of December, so it's
> > > best to
> > > > > > >>>>>> not have deadlines then.
> > > > > > >>>>>>
> > > > > > >>>>>> Thanks,
> > > > > > >>>>>> Mickael
> > > > > > >>>>>>
> > > > > > >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <
> > > christololov@gmail.com>
> > > > > > >>>> wrote:
> > > > > > >>>>>>>
> > > > > > >>>>>>> Hello!
> > > > > > >>>>>>>
> > > > > > >>>>>>> Thanks for the review!
> > > > > > >>>>>>>
> > > > > > >>>>>>> I am okay with pulling all dates by 2 weeks earlier in time
> > > (barring
> > > > > > >>>> the
> > > > > > >>>>>>> 7th of January one). If there are no objections to the new
> > > dates I
> > > > > > >>>> will
> > > > > > >>>>>>> update them in the plan tomorrow!
> > > > > > >>>>>>>
> > > > > > >>>>>>> Best,
> > > > > > >>>>>>> Christo
> > > > > > >>>>>>>
> > > > > > >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com>
> > > wrote:
> > > > > > >>>>>>>
> > > > > > >>>>>>>> Hi Christo,
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> Thanks for managing the release and for the proposed
> > > release plan.
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> Given our desire to ship every 4 months, I think the
> > > proposed
> > > > > > >>>> dates should
> > > > > > >>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in
> > > mid
> > > > > > >>>> July and for
> > > > > > >>>>>>>> 4.2 to ship in mid November. The former eventually shipped
> > > on
> > > > > > >>>> September 2nd
> > > > > > >>>>>>>> and with the current plan would probably result in 4.2
> > > shipping in
> > > > > > >>>> late
> > > > > > >>>>>>>> January/early February. Given where we are, I would suggest
> > > > > > >>>> something like:
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> KIP Freeze: October 29 (Wednesday)
> > > > > > >>>>>>>> Feature Freeze: November 19 (Wednesday)
> > > > > > >>>>>>>> Code Freeze: December 10 (Wednesday)
> > > > > > >>>>>>>> At least four weeks of stabilization will follow Code Freeze
> > > > > > >>>> (taking
> > > > > > >>>>>>>> holidays into account), meaning we expect to release no
> > > earlier
> > > > > > >>>> than
> > > > > > >>>>>>>> January 7 2026.
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
> > > > > > >>>> complete the
> > > > > > >>>>>>>> release by early/mid January.
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> Thoughts?
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> Ismael
> > > > > > >>>>>>>>
> > > > > > >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> > > > > > >>>> christololov@gmail.com>
> > > > > > >>>>>>>> wrote:
> > > > > > >>>>>>>>
> > > > > > >>>>>>>>> Hello!
> > > > > > >>>>>>>>>
> > > > > > >>>>>>>>> I would like to volunteer to be the release manager for the
> > > > > > >>>> Apache Kafka
> > > > > > >>>>>>>>> 4.2.0 release.
> > > > > > >>>>>>>>>
> > > > > > >>>>>>>>> If no one has any objections, you can find a proposed
> > > release
> > > > > > >>>> plan at
> > > > > > >>>>>>>>>
> > > > > > >>>>
> > > https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> > > > > > >>>>>>>>>
> > > > > > >>>>>>>>> Thanks,
> > > > > > >>>>>>>>> Christo
> > > > > > >>>>>>>>>
> > > > > > >>>>>>>>
> > > > > > >>>>
> > > > > > >>
> > > > > >
> > >
> >

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Andrew Schofield <sc...@apache.org>.
Hi Christo,
I'd like to give an update on progress for KIP-932 and KIP-1226. Today has been challenging because of build failures on account of an OOM in the client unit tests. We have now identified the troublesome commit and just merged a fix.

PRs for 3 of the remaining 5 subtasks for KIP-932 (https://issues.apache.org/jira/browse/KAFKA-16092) are ready but the build problems thwarted their completion. This is one code fix, a PR to mark interfaces as stable, and documentation. That leaves 1 subtask (https://issues.apache.org/jira/browse/KAFKA-17541) which should complete this week, and another (https://issues.apache.org/jira/browse/KAFKA-19865) which is documenting metrics.

The final task for KIP-1226 has an approved PR which again has been hampered today by the builds.

I wonder whether you could postpone cutting the release branch by one day until the morning of 21st. If not, we can cherry-pick, but I thought I'd ask.

Thanks,
Andrew

On 2025/11/19 11:28:58 David Jacot wrote:
> Hi Chisto,
> 
> I have added KIP-1224 to the release plan because we completed the
> implementation.
> 
> Best,
> David
> 
> On Wed, Nov 19, 2025 at 11:06 AM Lucas Brutschy
> <lb...@confluent.io.invalid> wrote:
> 
> > Hi Christo,
> >
> > I have added KIP-1071 to the release plan. After EA in 4.1, this
> > release will mark GA (stable & production-ready) for a limited feature
> > set. We will add details to the Kafka Streams upgrade guide.
> >
> > Thanks,
> > Lucas
> >
> > On Tue, Nov 18, 2025 at 2:44 PM Christo Lolov <ch...@gmail.com>
> > wrote:
> > >
> > > Heya Andrew,
> > >
> > > Thanks a lot for adding the KIPs.
> > >
> > > On a separate note, tomorrow (19th of November) is the feature freeze
> > > date. I will wait until the morning of the 20th to cut the release
> > > branch and from then on any necessary commits should be cherry-picked
> > > to that branch.
> > >
> > > Let me know if the freeze date needs adjustment!
> > >
> > > Best,
> > > Christo
> > >
> > > On Tue, 18 Nov 2025 at 12:23, Andrew Schofield <sc...@apache.org>
> > wrote:
> > > >
> > > > Hi Christo,
> > > > I've added a few KIPs to the 4.2 release plan.
> > > >
> > > > KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one PR
> > still in progress and a few reviews. Documentation will extend past the
> > feature freeze.
> > > > KIP-1226 (Share group lag) is complete apart from one PR for
> > integration tests which is under review and almost ready.
> > > > KIP-1227 (Expose rack ID in member description) which is complete and
> > was missing from the list.
> > > >
> > > > Thanks,
> > > > Andrew
> > > >
> > > > On 2025/11/05 15:12:18 Christo Lolov wrote:
> > > > > Heya!
> > > > >
> > > > > Sure, I will add them to the release plan. Let me know if there are
> > problems with the implementation!
> > > > >
> > > > > Best,
> > > > > Christo
> > > > >
> > > > > > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org>
> > wrote:
> > > > > >
> > > > > > hi Christo
> > > > > >
> > > > > > Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their
> > implementations are simple, so I believe they can be completed in time for
> > the feature freeze.
> > > > > >
> > > > > > Best,
> > > > > > Chia-Ping
> > > > > >
> > > > > >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> > > > > >> Heya Justine,
> > > > > >>
> > > > > >> Sure, I will include it in the release plan! Let me know if you
> > encounter issues with implementation or reviews!
> > > > > >>
> > > > > >> Best,
> > > > > >> Christo
> > > > > >>
> > > > > >>>> On 30 Oct 2025, at 16:27, Justine Olshan
> > <jo...@confluent.io.invalid> wrote:
> > > > > >>>
> > > > > >>> Hey Christo
> > > > > >>> I was wondering if we could include KIP-1228 in the 4.2 release.
> > We have
> > > > > >>> the required votes -- we just didn't officially close the vote
> > yet.
> > > > > >>> I think we should also be able to implement it in time for the
> > feature
> > > > > >>> freeze. What do you think?
> > > > > >>>
> > > > > >>> Thanks,
> > > > > >>> Justine
> > > > > >>>
> > > > > >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <
> > christololov@gmail.com>
> > > > > >>>> wrote:
> > > > > >>>>
> > > > > >>>> Hello!
> > > > > >>>>
> > > > > >>>> We have now passed the KIP freeze date for 4.2.0. The next goal
> > is the
> > > > > >>>> feature freeze on the 19th of November!
> > > > > >>>>
> > > > > >>>> Feel free to reachout on this thread if your changes are not
> > getting
> > > > > >>>> traction to meet that date!
> > > > > >>>>
> > > > > >>>> Best,
> > > > > >>>> Christo
> > > > > >>>>
> > > > > >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <
> > christololov@gmail.com>
> > > > > >>>>> wrote:
> > > > > >>>>>
> > > > > >>>>> Hello!
> > > > > >>>>>
> > > > > >>>>> This is to bump the 4.2.0 thread to the top of the mailing
> > list!
> > > > > >>>>>
> > > > > >>>>> The KIP freeze date is 1 week from today on the 29th of
> > October.
> > > > > >>>>> Please ensure that you have the required number of binding
> > votes for
> > > > > >>>>> your KIP by that date if you would like it included in 4.2.0.
> > > > > >>>>>
> > > > > >>>>> Best,
> > > > > >>>>> Christo
> > > > > >>>>>
> > > > > >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <
> > mickael.maison@gmail.com>
> > > > > >>>> wrote:
> > > > > >>>>>>
> > > > > >>>>>> Hi,
> > > > > >>>>>>
> > > > > >>>>>> I think moving code freeze to December 10 makes sense.
> > > > > >>>>>> Many people will be off the last 2 weeks of December, so it's
> > best to
> > > > > >>>>>> not have deadlines then.
> > > > > >>>>>>
> > > > > >>>>>> Thanks,
> > > > > >>>>>> Mickael
> > > > > >>>>>>
> > > > > >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <
> > christololov@gmail.com>
> > > > > >>>> wrote:
> > > > > >>>>>>>
> > > > > >>>>>>> Hello!
> > > > > >>>>>>>
> > > > > >>>>>>> Thanks for the review!
> > > > > >>>>>>>
> > > > > >>>>>>> I am okay with pulling all dates by 2 weeks earlier in time
> > (barring
> > > > > >>>> the
> > > > > >>>>>>> 7th of January one). If there are no objections to the new
> > dates I
> > > > > >>>> will
> > > > > >>>>>>> update them in the plan tomorrow!
> > > > > >>>>>>>
> > > > > >>>>>>> Best,
> > > > > >>>>>>> Christo
> > > > > >>>>>>>
> > > > > >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com>
> > wrote:
> > > > > >>>>>>>
> > > > > >>>>>>>> Hi Christo,
> > > > > >>>>>>>>
> > > > > >>>>>>>> Thanks for managing the release and for the proposed
> > release plan.
> > > > > >>>>>>>>
> > > > > >>>>>>>> Given our desire to ship every 4 months, I think the
> > proposed
> > > > > >>>> dates should
> > > > > >>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in
> > mid
> > > > > >>>> July and for
> > > > > >>>>>>>> 4.2 to ship in mid November. The former eventually shipped
> > on
> > > > > >>>> September 2nd
> > > > > >>>>>>>> and with the current plan would probably result in 4.2
> > shipping in
> > > > > >>>> late
> > > > > >>>>>>>> January/early February. Given where we are, I would suggest
> > > > > >>>> something like:
> > > > > >>>>>>>>
> > > > > >>>>>>>> KIP Freeze: October 29 (Wednesday)
> > > > > >>>>>>>> Feature Freeze: November 19 (Wednesday)
> > > > > >>>>>>>> Code Freeze: December 10 (Wednesday)
> > > > > >>>>>>>> At least four weeks of stabilization will follow Code Freeze
> > > > > >>>> (taking
> > > > > >>>>>>>> holidays into account), meaning we expect to release no
> > earlier
> > > > > >>>> than
> > > > > >>>>>>>> January 7 2026.
> > > > > >>>>>>>>
> > > > > >>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
> > > > > >>>> complete the
> > > > > >>>>>>>> release by early/mid January.
> > > > > >>>>>>>>
> > > > > >>>>>>>> Thoughts?
> > > > > >>>>>>>>
> > > > > >>>>>>>> Ismael
> > > > > >>>>>>>>
> > > > > >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> > > > > >>>> christololov@gmail.com>
> > > > > >>>>>>>> wrote:
> > > > > >>>>>>>>
> > > > > >>>>>>>>> Hello!
> > > > > >>>>>>>>>
> > > > > >>>>>>>>> I would like to volunteer to be the release manager for the
> > > > > >>>> Apache Kafka
> > > > > >>>>>>>>> 4.2.0 release.
> > > > > >>>>>>>>>
> > > > > >>>>>>>>> If no one has any objections, you can find a proposed
> > release
> > > > > >>>> plan at
> > > > > >>>>>>>>>
> > > > > >>>>
> > https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> > > > > >>>>>>>>>
> > > > > >>>>>>>>> Thanks,
> > > > > >>>>>>>>> Christo
> > > > > >>>>>>>>>
> > > > > >>>>>>>>
> > > > > >>>>
> > > > > >>
> > > > >
> >
> 

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by David Jacot <dj...@confluent.io.INVALID>.
Hi Chisto,

I have added KIP-1224 to the release plan because we completed the
implementation.

Best,
David

On Wed, Nov 19, 2025 at 11:06 AM Lucas Brutschy
<lb...@confluent.io.invalid> wrote:

> Hi Christo,
>
> I have added KIP-1071 to the release plan. After EA in 4.1, this
> release will mark GA (stable & production-ready) for a limited feature
> set. We will add details to the Kafka Streams upgrade guide.
>
> Thanks,
> Lucas
>
> On Tue, Nov 18, 2025 at 2:44 PM Christo Lolov <ch...@gmail.com>
> wrote:
> >
> > Heya Andrew,
> >
> > Thanks a lot for adding the KIPs.
> >
> > On a separate note, tomorrow (19th of November) is the feature freeze
> > date. I will wait until the morning of the 20th to cut the release
> > branch and from then on any necessary commits should be cherry-picked
> > to that branch.
> >
> > Let me know if the freeze date needs adjustment!
> >
> > Best,
> > Christo
> >
> > On Tue, 18 Nov 2025 at 12:23, Andrew Schofield <sc...@apache.org>
> wrote:
> > >
> > > Hi Christo,
> > > I've added a few KIPs to the 4.2 release plan.
> > >
> > > KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one PR
> still in progress and a few reviews. Documentation will extend past the
> feature freeze.
> > > KIP-1226 (Share group lag) is complete apart from one PR for
> integration tests which is under review and almost ready.
> > > KIP-1227 (Expose rack ID in member description) which is complete and
> was missing from the list.
> > >
> > > Thanks,
> > > Andrew
> > >
> > > On 2025/11/05 15:12:18 Christo Lolov wrote:
> > > > Heya!
> > > >
> > > > Sure, I will add them to the release plan. Let me know if there are
> problems with the implementation!
> > > >
> > > > Best,
> > > > Christo
> > > >
> > > > > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org>
> wrote:
> > > > >
> > > > > hi Christo
> > > > >
> > > > > Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their
> implementations are simple, so I believe they can be completed in time for
> the feature freeze.
> > > > >
> > > > > Best,
> > > > > Chia-Ping
> > > > >
> > > > >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> > > > >> Heya Justine,
> > > > >>
> > > > >> Sure, I will include it in the release plan! Let me know if you
> encounter issues with implementation or reviews!
> > > > >>
> > > > >> Best,
> > > > >> Christo
> > > > >>
> > > > >>>> On 30 Oct 2025, at 16:27, Justine Olshan
> <jo...@confluent.io.invalid> wrote:
> > > > >>>
> > > > >>> Hey Christo
> > > > >>> I was wondering if we could include KIP-1228 in the 4.2 release.
> We have
> > > > >>> the required votes -- we just didn't officially close the vote
> yet.
> > > > >>> I think we should also be able to implement it in time for the
> feature
> > > > >>> freeze. What do you think?
> > > > >>>
> > > > >>> Thanks,
> > > > >>> Justine
> > > > >>>
> > > > >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <
> christololov@gmail.com>
> > > > >>>> wrote:
> > > > >>>>
> > > > >>>> Hello!
> > > > >>>>
> > > > >>>> We have now passed the KIP freeze date for 4.2.0. The next goal
> is the
> > > > >>>> feature freeze on the 19th of November!
> > > > >>>>
> > > > >>>> Feel free to reachout on this thread if your changes are not
> getting
> > > > >>>> traction to meet that date!
> > > > >>>>
> > > > >>>> Best,
> > > > >>>> Christo
> > > > >>>>
> > > > >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <
> christololov@gmail.com>
> > > > >>>>> wrote:
> > > > >>>>>
> > > > >>>>> Hello!
> > > > >>>>>
> > > > >>>>> This is to bump the 4.2.0 thread to the top of the mailing
> list!
> > > > >>>>>
> > > > >>>>> The KIP freeze date is 1 week from today on the 29th of
> October.
> > > > >>>>> Please ensure that you have the required number of binding
> votes for
> > > > >>>>> your KIP by that date if you would like it included in 4.2.0.
> > > > >>>>>
> > > > >>>>> Best,
> > > > >>>>> Christo
> > > > >>>>>
> > > > >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <
> mickael.maison@gmail.com>
> > > > >>>> wrote:
> > > > >>>>>>
> > > > >>>>>> Hi,
> > > > >>>>>>
> > > > >>>>>> I think moving code freeze to December 10 makes sense.
> > > > >>>>>> Many people will be off the last 2 weeks of December, so it's
> best to
> > > > >>>>>> not have deadlines then.
> > > > >>>>>>
> > > > >>>>>> Thanks,
> > > > >>>>>> Mickael
> > > > >>>>>>
> > > > >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <
> christololov@gmail.com>
> > > > >>>> wrote:
> > > > >>>>>>>
> > > > >>>>>>> Hello!
> > > > >>>>>>>
> > > > >>>>>>> Thanks for the review!
> > > > >>>>>>>
> > > > >>>>>>> I am okay with pulling all dates by 2 weeks earlier in time
> (barring
> > > > >>>> the
> > > > >>>>>>> 7th of January one). If there are no objections to the new
> dates I
> > > > >>>> will
> > > > >>>>>>> update them in the plan tomorrow!
> > > > >>>>>>>
> > > > >>>>>>> Best,
> > > > >>>>>>> Christo
> > > > >>>>>>>
> > > > >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com>
> wrote:
> > > > >>>>>>>
> > > > >>>>>>>> Hi Christo,
> > > > >>>>>>>>
> > > > >>>>>>>> Thanks for managing the release and for the proposed
> release plan.
> > > > >>>>>>>>
> > > > >>>>>>>> Given our desire to ship every 4 months, I think the
> proposed
> > > > >>>> dates should
> > > > >>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in
> mid
> > > > >>>> July and for
> > > > >>>>>>>> 4.2 to ship in mid November. The former eventually shipped
> on
> > > > >>>> September 2nd
> > > > >>>>>>>> and with the current plan would probably result in 4.2
> shipping in
> > > > >>>> late
> > > > >>>>>>>> January/early February. Given where we are, I would suggest
> > > > >>>> something like:
> > > > >>>>>>>>
> > > > >>>>>>>> KIP Freeze: October 29 (Wednesday)
> > > > >>>>>>>> Feature Freeze: November 19 (Wednesday)
> > > > >>>>>>>> Code Freeze: December 10 (Wednesday)
> > > > >>>>>>>> At least four weeks of stabilization will follow Code Freeze
> > > > >>>> (taking
> > > > >>>>>>>> holidays into account), meaning we expect to release no
> earlier
> > > > >>>> than
> > > > >>>>>>>> January 7 2026.
> > > > >>>>>>>>
> > > > >>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
> > > > >>>> complete the
> > > > >>>>>>>> release by early/mid January.
> > > > >>>>>>>>
> > > > >>>>>>>> Thoughts?
> > > > >>>>>>>>
> > > > >>>>>>>> Ismael
> > > > >>>>>>>>
> > > > >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> > > > >>>> christololov@gmail.com>
> > > > >>>>>>>> wrote:
> > > > >>>>>>>>
> > > > >>>>>>>>> Hello!
> > > > >>>>>>>>>
> > > > >>>>>>>>> I would like to volunteer to be the release manager for the
> > > > >>>> Apache Kafka
> > > > >>>>>>>>> 4.2.0 release.
> > > > >>>>>>>>>
> > > > >>>>>>>>> If no one has any objections, you can find a proposed
> release
> > > > >>>> plan at
> > > > >>>>>>>>>
> > > > >>>>
> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> > > > >>>>>>>>>
> > > > >>>>>>>>> Thanks,
> > > > >>>>>>>>> Christo
> > > > >>>>>>>>>
> > > > >>>>>>>>
> > > > >>>>
> > > > >>
> > > >
>

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Lucas Brutschy <lb...@confluent.io.INVALID>.
Hi Christo,

I have added KIP-1071 to the release plan. After EA in 4.1, this
release will mark GA (stable & production-ready) for a limited feature
set. We will add details to the Kafka Streams upgrade guide.

Thanks,
Lucas

On Tue, Nov 18, 2025 at 2:44 PM Christo Lolov <ch...@gmail.com> wrote:
>
> Heya Andrew,
>
> Thanks a lot for adding the KIPs.
>
> On a separate note, tomorrow (19th of November) is the feature freeze
> date. I will wait until the morning of the 20th to cut the release
> branch and from then on any necessary commits should be cherry-picked
> to that branch.
>
> Let me know if the freeze date needs adjustment!
>
> Best,
> Christo
>
> On Tue, 18 Nov 2025 at 12:23, Andrew Schofield <sc...@apache.org> wrote:
> >
> > Hi Christo,
> > I've added a few KIPs to the 4.2 release plan.
> >
> > KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one PR still in progress and a few reviews. Documentation will extend past the feature freeze.
> > KIP-1226 (Share group lag) is complete apart from one PR for integration tests which is under review and almost ready.
> > KIP-1227 (Expose rack ID in member description) which is complete and was missing from the list.
> >
> > Thanks,
> > Andrew
> >
> > On 2025/11/05 15:12:18 Christo Lolov wrote:
> > > Heya!
> > >
> > > Sure, I will add them to the release plan. Let me know if there are problems with the implementation!
> > >
> > > Best,
> > > Christo
> > >
> > > > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org> wrote:
> > > >
> > > > hi Christo
> > > >
> > > > Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their implementations are simple, so I believe they can be completed in time for the feature freeze.
> > > >
> > > > Best,
> > > > Chia-Ping
> > > >
> > > >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> > > >> Heya Justine,
> > > >>
> > > >> Sure, I will include it in the release plan! Let me know if you encounter issues with implementation or reviews!
> > > >>
> > > >> Best,
> > > >> Christo
> > > >>
> > > >>>> On 30 Oct 2025, at 16:27, Justine Olshan <jo...@confluent.io.invalid> wrote:
> > > >>>
> > > >>> Hey Christo
> > > >>> I was wondering if we could include KIP-1228 in the 4.2 release. We have
> > > >>> the required votes -- we just didn't officially close the vote yet.
> > > >>> I think we should also be able to implement it in time for the feature
> > > >>> freeze. What do you think?
> > > >>>
> > > >>> Thanks,
> > > >>> Justine
> > > >>>
> > > >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <ch...@gmail.com>
> > > >>>> wrote:
> > > >>>>
> > > >>>> Hello!
> > > >>>>
> > > >>>> We have now passed the KIP freeze date for 4.2.0. The next goal is the
> > > >>>> feature freeze on the 19th of November!
> > > >>>>
> > > >>>> Feel free to reachout on this thread if your changes are not getting
> > > >>>> traction to meet that date!
> > > >>>>
> > > >>>> Best,
> > > >>>> Christo
> > > >>>>
> > > >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <ch...@gmail.com>
> > > >>>>> wrote:
> > > >>>>>
> > > >>>>> Hello!
> > > >>>>>
> > > >>>>> This is to bump the 4.2.0 thread to the top of the mailing list!
> > > >>>>>
> > > >>>>> The KIP freeze date is 1 week from today on the 29th of October.
> > > >>>>> Please ensure that you have the required number of binding votes for
> > > >>>>> your KIP by that date if you would like it included in 4.2.0.
> > > >>>>>
> > > >>>>> Best,
> > > >>>>> Christo
> > > >>>>>
> > > >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <mi...@gmail.com>
> > > >>>> wrote:
> > > >>>>>>
> > > >>>>>> Hi,
> > > >>>>>>
> > > >>>>>> I think moving code freeze to December 10 makes sense.
> > > >>>>>> Many people will be off the last 2 weeks of December, so it's best to
> > > >>>>>> not have deadlines then.
> > > >>>>>>
> > > >>>>>> Thanks,
> > > >>>>>> Mickael
> > > >>>>>>
> > > >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <ch...@gmail.com>
> > > >>>> wrote:
> > > >>>>>>>
> > > >>>>>>> Hello!
> > > >>>>>>>
> > > >>>>>>> Thanks for the review!
> > > >>>>>>>
> > > >>>>>>> I am okay with pulling all dates by 2 weeks earlier in time (barring
> > > >>>> the
> > > >>>>>>> 7th of January one). If there are no objections to the new dates I
> > > >>>> will
> > > >>>>>>> update them in the plan tomorrow!
> > > >>>>>>>
> > > >>>>>>> Best,
> > > >>>>>>> Christo
> > > >>>>>>>
> > > >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com> wrote:
> > > >>>>>>>
> > > >>>>>>>> Hi Christo,
> > > >>>>>>>>
> > > >>>>>>>> Thanks for managing the release and for the proposed release plan.
> > > >>>>>>>>
> > > >>>>>>>> Given our desire to ship every 4 months, I think the proposed
> > > >>>> dates should
> > > >>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in mid
> > > >>>> July and for
> > > >>>>>>>> 4.2 to ship in mid November. The former eventually shipped on
> > > >>>> September 2nd
> > > >>>>>>>> and with the current plan would probably result in 4.2 shipping in
> > > >>>> late
> > > >>>>>>>> January/early February. Given where we are, I would suggest
> > > >>>> something like:
> > > >>>>>>>>
> > > >>>>>>>> KIP Freeze: October 29 (Wednesday)
> > > >>>>>>>> Feature Freeze: November 19 (Wednesday)
> > > >>>>>>>> Code Freeze: December 10 (Wednesday)
> > > >>>>>>>> At least four weeks of stabilization will follow Code Freeze
> > > >>>> (taking
> > > >>>>>>>> holidays into account), meaning we expect to release no earlier
> > > >>>> than
> > > >>>>>>>> January 7 2026.
> > > >>>>>>>>
> > > >>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
> > > >>>> complete the
> > > >>>>>>>> release by early/mid January.
> > > >>>>>>>>
> > > >>>>>>>> Thoughts?
> > > >>>>>>>>
> > > >>>>>>>> Ismael
> > > >>>>>>>>
> > > >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> > > >>>> christololov@gmail.com>
> > > >>>>>>>> wrote:
> > > >>>>>>>>
> > > >>>>>>>>> Hello!
> > > >>>>>>>>>
> > > >>>>>>>>> I would like to volunteer to be the release manager for the
> > > >>>> Apache Kafka
> > > >>>>>>>>> 4.2.0 release.
> > > >>>>>>>>>
> > > >>>>>>>>> If no one has any objections, you can find a proposed release
> > > >>>> plan at
> > > >>>>>>>>>
> > > >>>> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> > > >>>>>>>>>
> > > >>>>>>>>> Thanks,
> > > >>>>>>>>> Christo
> > > >>>>>>>>>
> > > >>>>>>>>
> > > >>>>
> > > >>
> > >

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Christo Lolov <ch...@gmail.com>.
Heya Andrew,

Thanks a lot for adding the KIPs.

On a separate note, tomorrow (19th of November) is the feature freeze
date. I will wait until the morning of the 20th to cut the release
branch and from then on any necessary commits should be cherry-picked
to that branch.

Let me know if the freeze date needs adjustment!

Best,
Christo

On Tue, 18 Nov 2025 at 12:23, Andrew Schofield <sc...@apache.org> wrote:
>
> Hi Christo,
> I've added a few KIPs to the 4.2 release plan.
>
> KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one PR still in progress and a few reviews. Documentation will extend past the feature freeze.
> KIP-1226 (Share group lag) is complete apart from one PR for integration tests which is under review and almost ready.
> KIP-1227 (Expose rack ID in member description) which is complete and was missing from the list.
>
> Thanks,
> Andrew
>
> On 2025/11/05 15:12:18 Christo Lolov wrote:
> > Heya!
> >
> > Sure, I will add them to the release plan. Let me know if there are problems with the implementation!
> >
> > Best,
> > Christo
> >
> > > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org> wrote:
> > >
> > > hi Christo
> > >
> > > Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their implementations are simple, so I believe they can be completed in time for the feature freeze.
> > >
> > > Best,
> > > Chia-Ping
> > >
> > >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> > >> Heya Justine,
> > >>
> > >> Sure, I will include it in the release plan! Let me know if you encounter issues with implementation or reviews!
> > >>
> > >> Best,
> > >> Christo
> > >>
> > >>>> On 30 Oct 2025, at 16:27, Justine Olshan <jo...@confluent.io.invalid> wrote:
> > >>>
> > >>> Hey Christo
> > >>> I was wondering if we could include KIP-1228 in the 4.2 release. We have
> > >>> the required votes -- we just didn't officially close the vote yet.
> > >>> I think we should also be able to implement it in time for the feature
> > >>> freeze. What do you think?
> > >>>
> > >>> Thanks,
> > >>> Justine
> > >>>
> > >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <ch...@gmail.com>
> > >>>> wrote:
> > >>>>
> > >>>> Hello!
> > >>>>
> > >>>> We have now passed the KIP freeze date for 4.2.0. The next goal is the
> > >>>> feature freeze on the 19th of November!
> > >>>>
> > >>>> Feel free to reachout on this thread if your changes are not getting
> > >>>> traction to meet that date!
> > >>>>
> > >>>> Best,
> > >>>> Christo
> > >>>>
> > >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <ch...@gmail.com>
> > >>>>> wrote:
> > >>>>>
> > >>>>> Hello!
> > >>>>>
> > >>>>> This is to bump the 4.2.0 thread to the top of the mailing list!
> > >>>>>
> > >>>>> The KIP freeze date is 1 week from today on the 29th of October.
> > >>>>> Please ensure that you have the required number of binding votes for
> > >>>>> your KIP by that date if you would like it included in 4.2.0.
> > >>>>>
> > >>>>> Best,
> > >>>>> Christo
> > >>>>>
> > >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <mi...@gmail.com>
> > >>>> wrote:
> > >>>>>>
> > >>>>>> Hi,
> > >>>>>>
> > >>>>>> I think moving code freeze to December 10 makes sense.
> > >>>>>> Many people will be off the last 2 weeks of December, so it's best to
> > >>>>>> not have deadlines then.
> > >>>>>>
> > >>>>>> Thanks,
> > >>>>>> Mickael
> > >>>>>>
> > >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <ch...@gmail.com>
> > >>>> wrote:
> > >>>>>>>
> > >>>>>>> Hello!
> > >>>>>>>
> > >>>>>>> Thanks for the review!
> > >>>>>>>
> > >>>>>>> I am okay with pulling all dates by 2 weeks earlier in time (barring
> > >>>> the
> > >>>>>>> 7th of January one). If there are no objections to the new dates I
> > >>>> will
> > >>>>>>> update them in the plan tomorrow!
> > >>>>>>>
> > >>>>>>> Best,
> > >>>>>>> Christo
> > >>>>>>>
> > >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com> wrote:
> > >>>>>>>
> > >>>>>>>> Hi Christo,
> > >>>>>>>>
> > >>>>>>>> Thanks for managing the release and for the proposed release plan.
> > >>>>>>>>
> > >>>>>>>> Given our desire to ship every 4 months, I think the proposed
> > >>>> dates should
> > >>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in mid
> > >>>> July and for
> > >>>>>>>> 4.2 to ship in mid November. The former eventually shipped on
> > >>>> September 2nd
> > >>>>>>>> and with the current plan would probably result in 4.2 shipping in
> > >>>> late
> > >>>>>>>> January/early February. Given where we are, I would suggest
> > >>>> something like:
> > >>>>>>>>
> > >>>>>>>> KIP Freeze: October 29 (Wednesday)
> > >>>>>>>> Feature Freeze: November 19 (Wednesday)
> > >>>>>>>> Code Freeze: December 10 (Wednesday)
> > >>>>>>>> At least four weeks of stabilization will follow Code Freeze
> > >>>> (taking
> > >>>>>>>> holidays into account), meaning we expect to release no earlier
> > >>>> than
> > >>>>>>>> January 7 2026.
> > >>>>>>>>
> > >>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
> > >>>> complete the
> > >>>>>>>> release by early/mid January.
> > >>>>>>>>
> > >>>>>>>> Thoughts?
> > >>>>>>>>
> > >>>>>>>> Ismael
> > >>>>>>>>
> > >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> > >>>> christololov@gmail.com>
> > >>>>>>>> wrote:
> > >>>>>>>>
> > >>>>>>>>> Hello!
> > >>>>>>>>>
> > >>>>>>>>> I would like to volunteer to be the release manager for the
> > >>>> Apache Kafka
> > >>>>>>>>> 4.2.0 release.
> > >>>>>>>>>
> > >>>>>>>>> If no one has any objections, you can find a proposed release
> > >>>> plan at
> > >>>>>>>>>
> > >>>> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> > >>>>>>>>>
> > >>>>>>>>> Thanks,
> > >>>>>>>>> Christo
> > >>>>>>>>>
> > >>>>>>>>
> > >>>>
> > >>
> >

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Andrew Schofield <sc...@apache.org>.
Hi Christo,
I've added a few KIPs to the 4.2 release plan.

KIP-932 (Queues for Kafka) is planning to GA in 4.2. We have one PR still in progress and a few reviews. Documentation will extend past the feature freeze.
KIP-1226 (Share group lag) is complete apart from one PR for integration tests which is under review and almost ready.
KIP-1227 (Expose rack ID in member description) which is complete and was missing from the list.

Thanks,
Andrew

On 2025/11/05 15:12:18 Christo Lolov wrote:
> Heya!
> 
> Sure, I will add them to the release plan. Let me know if there are problems with the implementation!
> 
> Best,
> Christo
> 
> > On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org> wrote:
> > 
> > hi Christo
> > 
> > Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their implementations are simple, so I believe they can be completed in time for the feature freeze.
> > 
> > Best,
> > Chia-Ping
> > 
> >> On 2025/11/03 09:39:48 Christo Lolov wrote:
> >> Heya Justine,
> >> 
> >> Sure, I will include it in the release plan! Let me know if you encounter issues with implementation or reviews!
> >> 
> >> Best,
> >> Christo
> >> 
> >>>> On 30 Oct 2025, at 16:27, Justine Olshan <jo...@confluent.io.invalid> wrote:
> >>> 
> >>> Hey Christo
> >>> I was wondering if we could include KIP-1228 in the 4.2 release. We have
> >>> the required votes -- we just didn't officially close the vote yet.
> >>> I think we should also be able to implement it in time for the feature
> >>> freeze. What do you think?
> >>> 
> >>> Thanks,
> >>> Justine
> >>> 
> >>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <ch...@gmail.com>
> >>>> wrote:
> >>>> 
> >>>> Hello!
> >>>> 
> >>>> We have now passed the KIP freeze date for 4.2.0. The next goal is the
> >>>> feature freeze on the 19th of November!
> >>>> 
> >>>> Feel free to reachout on this thread if your changes are not getting
> >>>> traction to meet that date!
> >>>> 
> >>>> Best,
> >>>> Christo
> >>>> 
> >>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <ch...@gmail.com>
> >>>>> wrote:
> >>>>> 
> >>>>> Hello!
> >>>>> 
> >>>>> This is to bump the 4.2.0 thread to the top of the mailing list!
> >>>>> 
> >>>>> The KIP freeze date is 1 week from today on the 29th of October.
> >>>>> Please ensure that you have the required number of binding votes for
> >>>>> your KIP by that date if you would like it included in 4.2.0.
> >>>>> 
> >>>>> Best,
> >>>>> Christo
> >>>>> 
> >>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <mi...@gmail.com>
> >>>> wrote:
> >>>>>> 
> >>>>>> Hi,
> >>>>>> 
> >>>>>> I think moving code freeze to December 10 makes sense.
> >>>>>> Many people will be off the last 2 weeks of December, so it's best to
> >>>>>> not have deadlines then.
> >>>>>> 
> >>>>>> Thanks,
> >>>>>> Mickael
> >>>>>> 
> >>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <ch...@gmail.com>
> >>>> wrote:
> >>>>>>> 
> >>>>>>> Hello!
> >>>>>>> 
> >>>>>>> Thanks for the review!
> >>>>>>> 
> >>>>>>> I am okay with pulling all dates by 2 weeks earlier in time (barring
> >>>> the
> >>>>>>> 7th of January one). If there are no objections to the new dates I
> >>>> will
> >>>>>>> update them in the plan tomorrow!
> >>>>>>> 
> >>>>>>> Best,
> >>>>>>> Christo
> >>>>>>> 
> >>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com> wrote:
> >>>>>>> 
> >>>>>>>> Hi Christo,
> >>>>>>>> 
> >>>>>>>> Thanks for managing the release and for the proposed release plan.
> >>>>>>>> 
> >>>>>>>> Given our desire to ship every 4 months, I think the proposed
> >>>> dates should
> >>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in mid
> >>>> July and for
> >>>>>>>> 4.2 to ship in mid November. The former eventually shipped on
> >>>> September 2nd
> >>>>>>>> and with the current plan would probably result in 4.2 shipping in
> >>>> late
> >>>>>>>> January/early February. Given where we are, I would suggest
> >>>> something like:
> >>>>>>>> 
> >>>>>>>> KIP Freeze: October 29 (Wednesday)
> >>>>>>>> Feature Freeze: November 19 (Wednesday)
> >>>>>>>> Code Freeze: December 10 (Wednesday)
> >>>>>>>> At least four weeks of stabilization will follow Code Freeze
> >>>> (taking
> >>>>>>>> holidays into account), meaning we expect to release no earlier
> >>>> than
> >>>>>>>> January 7 2026.
> >>>>>>>> 
> >>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
> >>>> complete the
> >>>>>>>> release by early/mid January.
> >>>>>>>> 
> >>>>>>>> Thoughts?
> >>>>>>>> 
> >>>>>>>> Ismael
> >>>>>>>> 
> >>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> >>>> christololov@gmail.com>
> >>>>>>>> wrote:
> >>>>>>>> 
> >>>>>>>>> Hello!
> >>>>>>>>> 
> >>>>>>>>> I would like to volunteer to be the release manager for the
> >>>> Apache Kafka
> >>>>>>>>> 4.2.0 release.
> >>>>>>>>> 
> >>>>>>>>> If no one has any objections, you can find a proposed release
> >>>> plan at
> >>>>>>>>> 
> >>>> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> >>>>>>>>> 
> >>>>>>>>> Thanks,
> >>>>>>>>> Christo
> >>>>>>>>> 
> >>>>>>>> 
> >>>> 
> >> 
> 

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Christo Lolov <ch...@gmail.com>.
Heya!

Sure, I will add them to the release plan. Let me know if there are problems with the implementation!

Best,
Christo

> On 4 Nov 2025, at 14:34, Chia-Ping Tsai <ch...@apache.org> wrote:
> 
> hi Christo
> 
> Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their implementations are simple, so I believe they can be completed in time for the feature freeze.
> 
> Best,
> Chia-Ping
> 
>> On 2025/11/03 09:39:48 Christo Lolov wrote:
>> Heya Justine,
>> 
>> Sure, I will include it in the release plan! Let me know if you encounter issues with implementation or reviews!
>> 
>> Best,
>> Christo
>> 
>>>> On 30 Oct 2025, at 16:27, Justine Olshan <jo...@confluent.io.invalid> wrote:
>>> 
>>> Hey Christo
>>> I was wondering if we could include KIP-1228 in the 4.2 release. We have
>>> the required votes -- we just didn't officially close the vote yet.
>>> I think we should also be able to implement it in time for the feature
>>> freeze. What do you think?
>>> 
>>> Thanks,
>>> Justine
>>> 
>>>> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <ch...@gmail.com>
>>>> wrote:
>>>> 
>>>> Hello!
>>>> 
>>>> We have now passed the KIP freeze date for 4.2.0. The next goal is the
>>>> feature freeze on the 19th of November!
>>>> 
>>>> Feel free to reachout on this thread if your changes are not getting
>>>> traction to meet that date!
>>>> 
>>>> Best,
>>>> Christo
>>>> 
>>>>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <ch...@gmail.com>
>>>>> wrote:
>>>>> 
>>>>> Hello!
>>>>> 
>>>>> This is to bump the 4.2.0 thread to the top of the mailing list!
>>>>> 
>>>>> The KIP freeze date is 1 week from today on the 29th of October.
>>>>> Please ensure that you have the required number of binding votes for
>>>>> your KIP by that date if you would like it included in 4.2.0.
>>>>> 
>>>>> Best,
>>>>> Christo
>>>>> 
>>>>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <mi...@gmail.com>
>>>> wrote:
>>>>>> 
>>>>>> Hi,
>>>>>> 
>>>>>> I think moving code freeze to December 10 makes sense.
>>>>>> Many people will be off the last 2 weeks of December, so it's best to
>>>>>> not have deadlines then.
>>>>>> 
>>>>>> Thanks,
>>>>>> Mickael
>>>>>> 
>>>>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <ch...@gmail.com>
>>>> wrote:
>>>>>>> 
>>>>>>> Hello!
>>>>>>> 
>>>>>>> Thanks for the review!
>>>>>>> 
>>>>>>> I am okay with pulling all dates by 2 weeks earlier in time (barring
>>>> the
>>>>>>> 7th of January one). If there are no objections to the new dates I
>>>> will
>>>>>>> update them in the plan tomorrow!
>>>>>>> 
>>>>>>> Best,
>>>>>>> Christo
>>>>>>> 
>>>>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com> wrote:
>>>>>>> 
>>>>>>>> Hi Christo,
>>>>>>>> 
>>>>>>>> Thanks for managing the release and for the proposed release plan.
>>>>>>>> 
>>>>>>>> Given our desire to ship every 4 months, I think the proposed
>>>> dates should
>>>>>>>> be shifted a bit. The original plan was for 4.1 to ship in mid
>>>> July and for
>>>>>>>> 4.2 to ship in mid November. The former eventually shipped on
>>>> September 2nd
>>>>>>>> and with the current plan would probably result in 4.2 shipping in
>>>> late
>>>>>>>> January/early February. Given where we are, I would suggest
>>>> something like:
>>>>>>>> 
>>>>>>>> KIP Freeze: October 29 (Wednesday)
>>>>>>>> Feature Freeze: November 19 (Wednesday)
>>>>>>>> Code Freeze: December 10 (Wednesday)
>>>>>>>> At least four weeks of stabilization will follow Code Freeze
>>>> (taking
>>>>>>>> holidays into account), meaning we expect to release no earlier
>>>> than
>>>>>>>> January 7 2026.
>>>>>>>> 
>>>>>>>> Ideally, we'd get RC0 out before the holiday break and then
>>>> complete the
>>>>>>>> release by early/mid January.
>>>>>>>> 
>>>>>>>> Thoughts?
>>>>>>>> 
>>>>>>>> Ismael
>>>>>>>> 
>>>>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
>>>> christololov@gmail.com>
>>>>>>>> wrote:
>>>>>>>> 
>>>>>>>>> Hello!
>>>>>>>>> 
>>>>>>>>> I would like to volunteer to be the release manager for the
>>>> Apache Kafka
>>>>>>>>> 4.2.0 release.
>>>>>>>>> 
>>>>>>>>> If no one has any objections, you can find a proposed release
>>>> plan at
>>>>>>>>> 
>>>> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
>>>>>>>>> 
>>>>>>>>> Thanks,
>>>>>>>>> Christo
>>>>>>>>> 
>>>>>>>> 
>>>> 
>> 

Re: [DISCUSS] Apache Kafka 4.2.0 release

Posted by Chia-Ping Tsai <ch...@apache.org>.
hi Christo

Could we include KIP-1196 and KIP-1231 in the 4.2 release? Their implementations are simple, so I believe they can be completed in time for the feature freeze.

Best,
Chia-Ping

On 2025/11/03 09:39:48 Christo Lolov wrote:
> Heya Justine,
> 
> Sure, I will include it in the release plan! Let me know if you encounter issues with implementation or reviews!
> 
> Best,
> Christo
> 
> > On 30 Oct 2025, at 16:27, Justine Olshan <jo...@confluent.io.invalid> wrote:
> > 
> > Hey Christo
> > I was wondering if we could include KIP-1228 in the 4.2 release. We have
> > the required votes -- we just didn't officially close the vote yet.
> > I think we should also be able to implement it in time for the feature
> > freeze. What do you think?
> > 
> > Thanks,
> > Justine
> > 
> >> On Thu, Oct 30, 2025 at 12:28 AM Christo Lolov <ch...@gmail.com>
> >> wrote:
> >> 
> >> Hello!
> >> 
> >> We have now passed the KIP freeze date for 4.2.0. The next goal is the
> >> feature freeze on the 19th of November!
> >> 
> >> Feel free to reachout on this thread if your changes are not getting
> >> traction to meet that date!
> >> 
> >> Best,
> >> Christo
> >> 
> >>> On Wed, 22 Oct 2025 at 11:16, Christo Lolov <ch...@gmail.com>
> >>> wrote:
> >>> 
> >>> Hello!
> >>> 
> >>> This is to bump the 4.2.0 thread to the top of the mailing list!
> >>> 
> >>> The KIP freeze date is 1 week from today on the 29th of October.
> >>> Please ensure that you have the required number of binding votes for
> >>> your KIP by that date if you would like it included in 4.2.0.
> >>> 
> >>> Best,
> >>> Christo
> >>> 
> >>> On Thu, 2 Oct 2025 at 15:08, Mickael Maison <mi...@gmail.com>
> >> wrote:
> >>>> 
> >>>> Hi,
> >>>> 
> >>>> I think moving code freeze to December 10 makes sense.
> >>>> Many people will be off the last 2 weeks of December, so it's best to
> >>>> not have deadlines then.
> >>>> 
> >>>> Thanks,
> >>>> Mickael
> >>>> 
> >>>> On Thu, Oct 2, 2025 at 3:49 PM Christo Lolov <ch...@gmail.com>
> >> wrote:
> >>>>> 
> >>>>> Hello!
> >>>>> 
> >>>>> Thanks for the review!
> >>>>> 
> >>>>> I am okay with pulling all dates by 2 weeks earlier in time (barring
> >> the
> >>>>> 7th of January one). If there are no objections to the new dates I
> >> will
> >>>>> update them in the plan tomorrow!
> >>>>> 
> >>>>> Best,
> >>>>> Christo
> >>>>> 
> >>>>> On Thu, 2 Oct 2025 at 07:14, Ismael Juma <me...@ismaeljuma.com> wrote:
> >>>>> 
> >>>>>> Hi Christo,
> >>>>>> 
> >>>>>> Thanks for managing the release and for the proposed release plan.
> >>>>>> 
> >>>>>> Given our desire to ship every 4 months, I think the proposed
> >> dates should
> >>>>>> be shifted a bit. The original plan was for 4.1 to ship in mid
> >> July and for
> >>>>>> 4.2 to ship in mid November. The former eventually shipped on
> >> September 2nd
> >>>>>> and with the current plan would probably result in 4.2 shipping in
> >> late
> >>>>>> January/early February. Given where we are, I would suggest
> >> something like:
> >>>>>> 
> >>>>>> KIP Freeze: October 29 (Wednesday)
> >>>>>> Feature Freeze: November 19 (Wednesday)
> >>>>>> Code Freeze: December 10 (Wednesday)
> >>>>>> At least four weeks of stabilization will follow Code Freeze
> >> (taking
> >>>>>> holidays into account), meaning we expect to release no earlier
> >> than
> >>>>>> January 7 2026.
> >>>>>> 
> >>>>>> Ideally, we'd get RC0 out before the holiday break and then
> >> complete the
> >>>>>> release by early/mid January.
> >>>>>> 
> >>>>>> Thoughts?
> >>>>>> 
> >>>>>> Ismael
> >>>>>> 
> >>>>>> On Tue, Sep 30, 2025 at 6:09 AM Christo Lolov <
> >> christololov@gmail.com>
> >>>>>> wrote:
> >>>>>> 
> >>>>>>> Hello!
> >>>>>>> 
> >>>>>>> I would like to volunteer to be the release manager for the
> >> Apache Kafka
> >>>>>>> 4.2.0 release.
> >>>>>>> 
> >>>>>>> If no one has any objections, you can find a proposed release
> >> plan at
> >>>>>>> 
> >> https://cwiki.apache.org/confluence/display/KAFKA/Release+Plan+4.2.0.
> >>>>>>> 
> >>>>>>> Thanks,
> >>>>>>> Christo
> >>>>>>> 
> >>>>>> 
> >> 
>