You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Sangjin Lee (JIRA)" <ji...@apache.org> on 2016/03/04 01:49:40 UTC

[jira] [Commented] (YARN-4761) NMs reconnecting with changed capabilities can lead to wrong cluster resource calculations on fair scheduler

    [ https://issues.apache.org/jira/browse/YARN-4761?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15179045#comment-15179045 ] 

Sangjin Lee commented on YARN-4761:
-----------------------------------

To see this, you add this code to {{TestResourceTrackerService#testReconnectNode}}:
{code}
  public void testReconnectNode() throws Exception {
    Configuration conf = new Configuration();
    conf.set(YarnConfiguration.RM_SCHEDULER,
        "org.apache.hadoop.yarn.server.resourcemanager.scheduler.fair.FairScheduler");
    rm = new MockRM(conf) {
    ...
{code}

and the test breaks:
{noformat}
testReconnectNode(org.apache.hadoop.yarn.server.resourcemanager.TestResourceTrackerService)  Time elapsed: 1.188 sec  <<< FAILURE!
java.lang.AssertionError: expected:<15360> but was:<10240>
	at org.junit.Assert.fail(Assert.java:88)
	at org.junit.Assert.failNotEquals(Assert.java:743)
	at org.junit.Assert.assertEquals(Assert.java:118)
	at org.junit.Assert.assertEquals(Assert.java:555)
	at org.junit.Assert.assertEquals(Assert.java:542)
	at org.apache.hadoop.yarn.server.resourcemanager.TestResourceTrackerService.testReconnectNode(TestResourceTrackerService.java:1044)
{noformat}

> NMs reconnecting with changed capabilities can lead to wrong cluster resource calculations on fair scheduler
> ------------------------------------------------------------------------------------------------------------
>
>                 Key: YARN-4761
>                 URL: https://issues.apache.org/jira/browse/YARN-4761
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: fairscheduler
>    Affects Versions: 2.6.4
>            Reporter: Sangjin Lee
>            Assignee: Sangjin Lee
>
> YARN-3802 uncovered an issue with the scheduler where the resource calculation can be incorrect due to async event handling. It was subsequently fixed by YARN-4344, but it was never fixed for the fair scheduler.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)