You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Kostas Kloudas (JIRA)" <ji...@apache.org> on 2019/02/26 15:52:00 UTC

[jira] [Assigned] (FLINK-11185) StreamSourceOperatorWatermarksTest failed with InterruptedException

     [ https://issues.apache.org/jira/browse/FLINK-11185?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Kostas Kloudas reassigned FLINK-11185:
--------------------------------------

    Assignee: Kostas Kloudas

> StreamSourceOperatorWatermarksTest failed with InterruptedException
> -------------------------------------------------------------------
>
>                 Key: FLINK-11185
>                 URL: https://issues.apache.org/jira/browse/FLINK-11185
>             Project: Flink
>          Issue Type: Bug
>            Reporter: Biao Liu
>            Assignee: Kostas Kloudas
>            Priority: Critical
>              Labels: test-stability
>             Fix For: 1.8.0
>
>
> {{StreamSourceOperatorWatermarksTest}} may be an unstable case. It failed in travis integration test.
> See details in: [https://api.travis-ci.org/v3/job/467336457/log.txt]



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)