You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Yichen Zhou (JIRA)" <ji...@apache.org> on 2018/11/08 08:07:00 UTC
[jira] [Updated] (KYLIN-3673) Increasing the limit of smoke-test
building time
[ https://issues.apache.org/jira/browse/KYLIN-3673?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Yichen Zhou updated KYLIN-3673:
-------------------------------
Summary: Increasing the limit of smoke-test building time (was: Increase smoke-test cube building time)
> Increasing the limit of smoke-test building time
> ------------------------------------------------
>
> Key: KYLIN-3673
> URL: https://issues.apache.org/jira/browse/KYLIN-3673
> Project: Kylin
> Issue Type: Test
> Components: Tools, Build and Test
> Affects Versions: v2.5.0
> Reporter: Yichen Zhou
> Assignee: Yichen Zhou
> Priority: Minor
>
> In smoke-test, cube building job which costs more than 20 mins will be treated as failure.
> This time is too short in some cases.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)