You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@beam.apache.org by "Eugene Kirpichov (JIRA)" <ji...@apache.org> on 2017/03/01 02:30:45 UTC
[jira] [Created] (BEAM-1579) Runners should verify that PT
overrides converged
Eugene Kirpichov created BEAM-1579:
--------------------------------------
Summary: Runners should verify that PT overrides converged
Key: BEAM-1579
URL: https://issues.apache.org/jira/browse/BEAM-1579
Project: Beam
Issue Type: Bug
Components: runner-core, runner-dataflow, runner-direct
Reporter: Eugene Kirpichov
Assignee: Thomas Groh
PT overrides are applied in order, see https://issues.apache.org/jira/browse/BEAM-1578 .
To make sure that the order is correct and avoid confusing errors, after applying the overrides in order, we should verify that the pipeline has converged, i.e. the overrides no longer match.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)