You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ignite.apache.org by "Alexey Goncharuk (JIRA)" <ji...@apache.org> on 2018/01/31 08:32:00 UTC
[jira] [Resolved] (IGNITE-7569) Index rebuild future is created too
late
[ https://issues.apache.org/jira/browse/IGNITE-7569?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Alexey Goncharuk resolved IGNITE-7569.
--------------------------------------
Resolution: Fixed
Merged to master
> Index rebuild future is created too late
> ----------------------------------------
>
> Key: IGNITE-7569
> URL: https://issues.apache.org/jira/browse/IGNITE-7569
> Project: Ignite
> Issue Type: Bug
> Affects Versions: 2.4
> Reporter: Alexey Goncharuk
> Assignee: Alexey Goncharuk
> Priority: Major
> Fix For: 2.5
>
>
> rebuildIndexesIfNeeded is called before the exchange future onDone method, which may be too late in a distributed case: a node may complete a local exchange and send a compute job to a remote node. In this case, if the job checks the index rebuild future, it may observe {{null}}.
> To fix this, we should create the future in beforeExchange, and complete it after the rebuild is finished.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)