You are viewing a plain text version of this content. The canonical link for it is here.
Posted to user@jmeter.apache.org by nlunebur <nl...@lisasoft.com> on 2004/07/01 01:19:00 UTC

Solution to Ramp Down Option

Hi All,
what i've done is something like this:

Thread Group (ramp-up period = 0, loop count = 1)
          Loop Controller
                      If Controller (Condition = ${__threadNum} <= 1)
                                  Http Requests
           Loop Controller
                      If Controller (Condition = ${__threadNum} <= 2)
                                  Http Requests    
          Loop Controller
                      If Controller (Condition = ${__threadNum} <= 3)
                                  Http Requests  

           etc ...

this way u can ramp down, and the period of ramp down can be set via the 
loop counts.
enjoy!

---------------------------------------------------------------------
To unsubscribe, e-mail: jmeter-user-unsubscribe@jakarta.apache.org
For additional commands, e-mail: jmeter-user-help@jakarta.apache.org