You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@continuum.apache.org by "Wendy Smoak (JIRA)" <ji...@codehaus.org> on 2009/12/09 19:58:57 UTC
[jira] Updated: (CONTINUUM-2409) Ability to move a project build to
the front of the queue
[ http://jira.codehaus.org/browse/CONTINUUM-2409?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Wendy Smoak updated CONTINUUM-2409:
-----------------------------------
Fix Version/s: Backlog
> Ability to move a project build to the front of the queue
> ---------------------------------------------------------
>
> Key: CONTINUUM-2409
> URL: http://jira.codehaus.org/browse/CONTINUUM-2409
> Project: Continuum
> Issue Type: New Feature
> Affects Versions: 1.3.4
> Reporter: Wendy Smoak
> Fix For: Backlog
>
>
> As a system administrator, I want some control over the order of projects in the build queue(s).
> Currently I can look at the displayQueues page and see the Current Build as well as all the things in the various queues, and I can cancel builds.
> Minimally, I would like to be able to choose an item and move it to the front of the line so that it builds next, after the current build finishes.
> (Ideally I could move things up and down in the various queues and have total control over the order.)
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira