You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Ted Yu (JIRA)" <ji...@apache.org> on 2013/04/15 04:38:15 UTC
[jira] [Reopened] (HBASE-8251) enable SSH before assign META on
Master startup
[ https://issues.apache.org/jira/browse/HBASE-8251?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Ted Yu reopened HBASE-8251:
---------------------------
> enable SSH before assign META on Master startup
> -----------------------------------------------
>
> Key: HBASE-8251
> URL: https://issues.apache.org/jira/browse/HBASE-8251
> Project: HBase
> Issue Type: Bug
> Components: master, Region Assignment
> Affects Versions: 0.94.6
> Reporter: Jieshan Bean
> Assignee: Jieshan Bean
> Attachments: HBASE-8251-94.patch, HBASE-8251-94-v2.patch
>
>
> I think HBASE-5918 could not fix this issue. In HMaster#assignRootAndMeta:
> 1. Assign ROOT.
> 2. Block until ROOT be opened.
> 3. Assign META.
> 4. Block until META be opened.
> SSH is enabled after step 4. So if the RS who host ROOT dies before step 4, master will be blocked.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira