You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@fineract.apache.org by "Ed Cable (Jira)" <ji...@apache.org> on 2019/11/18 15:16:00 UTC

[jira] [Assigned] (FINERACT-722) Integration test cases fail when run on the 1st of a month

     [ https://issues.apache.org/jira/browse/FINERACT-722?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Ed Cable reassigned FINERACT-722:
---------------------------------

    Assignee: Ed Cable

> Integration test cases fail when run on the 1st of a month
> ----------------------------------------------------------
>
>                 Key: FINERACT-722
>                 URL: https://issues.apache.org/jira/browse/FINERACT-722
>             Project: Apache Fineract
>          Issue Type: Bug
>    Affects Versions: 1.2.0, 1.3.0
>            Reporter: Vishwas Babu A J
>            Assignee: Ed Cable
>            Priority: Major
>              Labels: gsoc2019
>
> Set the system clock of the machine on which the test cases are run to the 1st of any month (say March 1st 2019). Now, running the test cases would result in a few failures.
> The cause of each of these failures (likely issues with the test case themselves, however, could also be application issues) needs to be analyzed and fixed.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)