You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Reid Chan (Jira)" <ji...@apache.org> on 2020/09/14 07:55:00 UTC
[jira] [Created] (HBASE-25024) [Flake Test][branch-1]
TestClientOperationInterrupt#testInterrupt50Percent
Reid Chan created HBASE-25024:
---------------------------------
Summary: [Flake Test][branch-1] TestClientOperationInterrupt#testInterrupt50Percent
Key: HBASE-25024
URL: https://issues.apache.org/jira/browse/HBASE-25024
Project: HBase
Issue Type: Improvement
Reporter: Reid Chan
Fix For: 1.7.0
Sometimes threads could finish faster than interrupt() gets called.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)