You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Fred Krone (JIRA)" <ji...@apache.org> on 2017/06/20 21:30:00 UTC
[jira] [Assigned] (GEODE-3107) Improve gfsh export time when doing
a snapshot
[ https://issues.apache.org/jira/browse/GEODE-3107?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Fred Krone reassigned GEODE-3107:
---------------------------------
Assignee: Anilkumar Gingade
> Improve gfsh export time when doing a snapshot
> ----------------------------------------------
>
> Key: GEODE-3107
> URL: https://issues.apache.org/jira/browse/GEODE-3107
> Project: Geode
> Issue Type: Bug
> Components: regions
> Affects Versions: 1.3.0
> Reporter: Fred Krone
> Assignee: Anilkumar Gingade
>
> Currently a large snapshot puts a lot of pressure on the locator which needs to hold all keys and they do not get destroyed.
> Snapshot goes through the JMX manager but snapshots can also be parallelized and in theory this will probably improve performance.
> It would be useful to benchmark the current gfsh export time on 1 TB region and compare it with performance improvements from this ticket.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)