You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@kylin.apache.org by "Zhong, Yanghong" <ya...@ebay.com> on 2018/03/05 03:50:36 UTC

Critical issue of v2.3 which will block cube planner phase two

Hi all,

Yesterday kylin 2.3 has just been released. However, we found there’s a critical issue caused by the factor of https://issues.apache.org/jira/browse/KYLIN-3085, which will block optimize jobs leading to block cube planner phase two. A JIRA has been created https://issues.apache.org/jira/browse/KYLIN-3270. Hope to take some action.


Best regards,
Yanghong Zhong
Email: yangzhong@ebay.com
Mobile: +86 13706747741


Re: Critical issue of v2.3 which will block cube planner phase two

Posted by "Zhong, Yanghong" <ya...@ebay.com>.
Hi Liu,

As I said in the JIRA, it will always block the optimize job. This issue is caused by the refactoring of KYLIN-3085. 

To avoid this kind of  issue in future, I added an IT for optimize job, patched in KYLIN-3270. The related fix is also included in that patch. If the IT passed, this issue should be fixed. I have tested that IT in master branch and IT passed.

Best regards,
Yanghong Zhong

Email: yangzhong@ebay.com
Mobile: +86 13706747741


On 3/5/18, 2:35 PM, "Billy Liu" <bi...@apache.org> wrote:

    Hi Yanghong,
    
    Could you explain more about this issue? In which situation it will
    block the cube planner? Have you tested this feature during the
    release prepare?
    
    With Warm regards
    
    Billy Liu
    
    
    2018-03-04 19:50 GMT-08:00 Zhong, Yanghong <ya...@ebay.com>:
    > Hi all,
    >
    > Yesterday kylin 2.3 has just been released. However, we found there’s a critical issue caused by the factor of https://issues.apache.org/jira/browse/KYLIN-3085, which will block optimize jobs leading to block cube planner phase two. A JIRA has been created https://issues.apache.org/jira/browse/KYLIN-3270. Hope to take some action.
    >
    >
    > Best regards,
    > Yanghong Zhong
    > Email: yangzhong@ebay.com
    > Mobile: +86 13706747741
    >
    


Re: Critical issue of v2.3 which will block cube planner phase two

Posted by Billy Liu <bi...@apache.org>.
Hi Yanghong,

Could you explain more about this issue? In which situation it will
block the cube planner? Have you tested this feature during the
release prepare?

With Warm regards

Billy Liu


2018-03-04 19:50 GMT-08:00 Zhong, Yanghong <ya...@ebay.com>:
> Hi all,
>
> Yesterday kylin 2.3 has just been released. However, we found there’s a critical issue caused by the factor of https://issues.apache.org/jira/browse/KYLIN-3085, which will block optimize jobs leading to block cube planner phase two. A JIRA has been created https://issues.apache.org/jira/browse/KYLIN-3270. Hope to take some action.
>
>
> Best regards,
> Yanghong Zhong
> Email: yangzhong@ebay.com
> Mobile: +86 13706747741
>