You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@streams.apache.org by "Steve Blackmon (JIRA)" <ji...@apache.org> on 2014/11/04 21:56:34 UTC

[jira] [Created] (STREAMS-208) Integration Testing capability and reference Integration Test

Steve Blackmon created STREAMS-208:
--------------------------------------

             Summary: Integration Testing capability and reference Integration Test
                 Key: STREAMS-208
                 URL: https://issues.apache.org/jira/browse/STREAMS-208
             Project: Streams
          Issue Type: Test
            Reporter: Steve Blackmon


Alter project poms such that mvn verify runs all tests ending with IT.  Add an IntegrationTest demonstrating how to compose a stream such that a specific set of datums can be passed into a mock provider and confirmed to have arrived at a mock persist writer at the end of the stream.  Keep number of mocks required to achieve this to a minimum.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)