Bikas Saha commented on TEZ-1522:
---------------------------------
I was trying to say the blindly following the slow start setting can result in downstream tasks getting scheduled ahead of upstream tasks. Also given that this is not a regression, I have made this critical but not a blocker. Unless this was made a blocker for local mode.
> ShuffleVertexManager scheduling can result in out of order execution and slowdown of upstream work
> --------------------------------------------------------------------------------------------------
>
> Key: TEZ-1522
> URL: https://issues.apache.org/jira/browse/TEZ-1522
> Project: Apache Tez
> Issue Type: Bug
> Reporter: Rajesh Balamohan
> Priority: Critical
> Labels: performance
> Attachments: task_runtime.svg
>
>
> M2 M7
> \ /
> (sg) \ /
> R3 / (b)
> \ /
> (b) \ /
> \ /
> M5
> |
> R6
> Plz refer to the attachment (task runtime SVG). In this case, M5 got scheduled much earlier than R3 (green color in the diagram) and retained lots of containers.
> R3 got less containers to work with.
> Attaching the output from the status monitor when the job ran; Map_5 has taken up almost all of cluster resource, whereas Reducer_3 got fraction of the capacity.
> Map_2: 1/1 Map_5: 0(+373)/1000 Map_7: 1/1 Reducer_3: 0/8000 Reducer_6: 0/1
> Map_2: 1/1 Map_5: 0(+374)/1000 Map_7: 1/1 Reducer_3: 0/8000 Reducer_6: 0/1
> Map_2: 1/1 Map_5: 0(+374)/1000 Map_7: 1/1 Reducer_3: 0(+1)/8000 Reducer_6: 0/1
> ....
> Map_2: 1/1 Map_5: 0(+374)/1000 Map_7: 1/1 Reducer_3: 14(+7)/8000 Reducer_6: 0/1
> Map_2: 1/1 Map_5: 0(+374)/1000 Map_7: 1/1 Reducer_3: 63(+14)/8000 Reducer_6: 0/1
> Map_2: 1/1 Map_5: 0(+374)/1000 Map_7: 1/1 Reducer_3: 159(+22)/8000 Reducer_6: 0/1
> Map_2: 1/1 Map_5: 0(+374)/1000 Map_7: 1/1 Reducer_3: 308(+29)/8000 Reducer_6: 0/1
> ...
> Creating this JIRA as a placeholder for scheduler enhancement. One possibililty could be to
> schedule lesser number of tasks in downstream vertices, based on the information available for the upstream vertex.
--