You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Subramaniam Krishnan (JIRA)" <ji...@apache.org> on 2014/09/12 03:06:33 UTC
[jira] [Updated] (YARN-2475) ReservationSystem: replan upon
capacity reduction
[ https://issues.apache.org/jira/browse/YARN-2475?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Subramaniam Krishnan updated YARN-2475:
---------------------------------------
Attachment: YARN-2475.patch
Thanks [~chris.douglas] for reviewing the patch. I am uploading a patch that addresses all your comments (skipping relisting them).
bq. Why is the enforcement window tied to CapacitySchedulerConfiguration?
The replanner can be configured per plan which in turn translates to a leaf queue in capacity scheduler configuration. Consequently the enforcement window is configured for the replanner via the capacity scheduler leaf queue configuration.
> ReservationSystem: replan upon capacity reduction
> -------------------------------------------------
>
> Key: YARN-2475
> URL: https://issues.apache.org/jira/browse/YARN-2475
> Project: Hadoop YARN
> Issue Type: Sub-task
> Components: resourcemanager
> Reporter: Carlo Curino
> Assignee: Carlo Curino
> Attachments: YARN-2475.patch, YARN-2475.patch
>
>
> In the context of YARN-1051, if capacity of the cluster drops significantly upon machine failures we need to trigger a reorganization of the planned reservations. As reservations are "absolute" it is possible that they will not all fit, and some need to be rejected a-posteriori.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)