You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Chandra Sekhar K (Jira)" <ji...@apache.org> on 2024/09/14 06:46:00 UTC

[jira] [Created] (HBASE-28838) Use CompletableFuture instead of fixed sleep during the move operation at master

Chandra Sekhar K created HBASE-28838:
----------------------------------------

             Summary: Use CompletableFuture instead of fixed sleep during the move operation at master 
                 Key: HBASE-28838
                 URL: https://issues.apache.org/jira/browse/HBASE-28838
             Project: HBase
          Issue Type: Improvement
            Reporter: Chandra Sekhar K
            Assignee: Chandra Sekhar K


During move operation master submits the RegionTransitionProcedure and waits for the completion of this procedure, current wait mechanism is based on fixed sleep intervals of 1 second.  The procedure could have finished earlier than this 1 second sleep.. optimize this by using CompletableFuture and return after the completion of TRSP procedure.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)