You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Vladimir Rodionov (JIRA)" <ji...@apache.org> on 2015/08/03 18:50:04 UTC
[jira] [Updated] (HBASE-14123) HBase Backup/Restore Phase 2
[ https://issues.apache.org/jira/browse/HBASE-14123?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Vladimir Rodionov updated HBASE-14123:
--------------------------------------
Attachment: HBASE-14123-v1.patch
First patch, incorporates (HBASE-14125, HBASE-14130, HBASE-14131, HBASE-14132, HBASE-14133)
> HBase Backup/Restore Phase 2
> ----------------------------
>
> Key: HBASE-14123
> URL: https://issues.apache.org/jira/browse/HBASE-14123
> Project: HBase
> Issue Type: Umbrella
> Reporter: Vladimir Rodionov
> Assignee: Vladimir Rodionov
> Attachments: HBASE-14123-v1.patch
>
>
> Phase 2 umbrella JIRA. See HBASE-7912 for design document and description.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)