You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@netbeans.apache.org by Neil C Smith <ne...@apache.org> on 2022/10/26 08:43:58 UTC

[RELEASES] Preparing for 16-rc2

Hi,

All opened PRs for delivery / NB16 have been merged.  Assuming all is
green, I'll sync to the release branch and trigger a build later today
or tomorrow.

Please no merging to delivery until the post-rc2 sync to master is done.

Thanks,

Neil

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@netbeans.apache.org
For additional commands, e-mail: dev-help@netbeans.apache.org

For further information about the NetBeans mailing lists, visit:
https://cwiki.apache.org/confluence/display/NETBEANS/Mailing+lists




Re: [RELEASES] Preparing for 16-rc2

Posted by Neil C Smith <ne...@apache.org>.
Hi,

Build completed the second time OK.

Sync to master is done.  Merging to delivery for rc3 is open.

Neil

On Thu, 27 Oct 2022 at 10:27, Neil C Smith <ne...@apache.org> wrote:
>
> Hi,
>
> Slight delay on rc2 as the build triggered yesterday timed out.
>
> Have triggered a second.  The problem is probably the upload time to nightlies.
>
> If the current build also times out, we should consider whether we
> reduce what is pushed there - source and binary zip probably enough.
> Or I push those manually.  NBMs probably not required there, or
> platform.
>
> Best wishes,
>
> Neil
>
> On Wed, 26 Oct 2022 at 09:43, Neil C Smith <ne...@apache.org> wrote:
> >
> > Hi,
> >
> > All opened PRs for delivery / NB16 have been merged.  Assuming all is
> > green, I'll sync to the release branch and trigger a build later today
> > or tomorrow.
> >
> > Please no merging to delivery until the post-rc2 sync to master is done.
> >
> > Thanks,
> >
> > Neil

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@netbeans.apache.org
For additional commands, e-mail: dev-help@netbeans.apache.org

For further information about the NetBeans mailing lists, visit:
https://cwiki.apache.org/confluence/display/NETBEANS/Mailing+lists




Re: [RELEASES] Preparing for 16-rc2

Posted by Neil C Smith <ne...@apache.org>.
Hi,

Slight delay on rc2 as the build triggered yesterday timed out.

Have triggered a second.  The problem is probably the upload time to nightlies.

If the current build also times out, we should consider whether we
reduce what is pushed there - source and binary zip probably enough.
Or I push those manually.  NBMs probably not required there, or
platform.

Best wishes,

Neil

On Wed, 26 Oct 2022 at 09:43, Neil C Smith <ne...@apache.org> wrote:
>
> Hi,
>
> All opened PRs for delivery / NB16 have been merged.  Assuming all is
> green, I'll sync to the release branch and trigger a build later today
> or tomorrow.
>
> Please no merging to delivery until the post-rc2 sync to master is done.
>
> Thanks,
>
> Neil

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@netbeans.apache.org
For additional commands, e-mail: dev-help@netbeans.apache.org

For further information about the NetBeans mailing lists, visit:
https://cwiki.apache.org/confluence/display/NETBEANS/Mailing+lists