You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@oozie.apache.org by "Anoop S Nair (JIRA)" <ji...@apache.org> on 2017/05/05 06:31:08 UTC
[jira] [Created] (OOZIE-2881) We shoul be having a feature to rerun
a Oozie job from a successful step
Anoop S Nair created OOZIE-2881:
-----------------------------------
Summary: We shoul be having a feature to rerun a Oozie job from a successful step
Key: OOZIE-2881
URL: https://issues.apache.org/jira/browse/OOZIE-2881
Project: Oozie
Issue Type: New Feature
Components: core
Reporter: Anoop S Nair
Priority: Minor
we currently have two methods to rerun a Oozie workflow job
one using failed node and another using skip nodes , but the real issue arises when we are unable to run a job with skip node once we have used failed node in past execution.
It becomes very hectic when we trigger a workflow with huge count of steps.It would we very helpful if we can have a method to re trigger a job from a successful node .
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)