You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@servicemix.apache.org by "Chris Odom (JIRA)" <ji...@apache.org> on 2014/08/15 23:39:18 UTC
[jira] [Closed] (SM-2364) OSGI bundle not available during shutdown
[ https://issues.apache.org/jira/browse/SM-2364?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Chris Odom closed SM-2364.
--------------------------
Resolution: Won't Fix
Moving to ServiceMix 4.x as it is a 4.x issue...:)
> OSGI bundle not available during shutdown
> -----------------------------------------
>
> Key: SM-2364
> URL: https://issues.apache.org/jira/browse/SM-2364
> Project: ServiceMix
> Issue Type: Bug
> Components: servicemix-camel
> Affects Versions: servicemix-utils-1.6.0
> Reporter: Chris Odom
>
> While shutting down Camel components that use NMR the org.apache.servicemix.nmr.osgi bundle is removed causing the NMR.unregisterEndpont to hang. The Camel Route will eventually shutdown after the timeout period occurs. I think there should be some dependency check so that if there are still registered endpoints that the underlying bundle does not shutdown.
--
This message was sent by Atlassian JIRA
(v6.2#6252)