You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Shaofeng SHI (JIRA)" <ji...@apache.org> on 2017/08/19 09:54:00 UTC

[jira] [Resolved] (KYLIN-1771) Run merge cube for old segments and build cube for new segment simultaneously

     [ https://issues.apache.org/jira/browse/KYLIN-1771?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Shaofeng SHI resolved KYLIN-1771.
---------------------------------
    Resolution: Fixed

> Run merge cube for old segments and build cube for new segment simultaneously
> -----------------------------------------------------------------------------
>
>                 Key: KYLIN-1771
>                 URL: https://issues.apache.org/jira/browse/KYLIN-1771
>             Project: Kylin
>          Issue Type: Improvement
>            Reporter: Vaibhav Taro
>            Assignee: Shaofeng SHI
>             Fix For: v1.6.0
>
>
> Right now with Kylin 1.5.2, it is not possible to run Cube merge for old segments and Cube build job for a new segment simultaneously. (I am not able to run cube merge if a cube build is already in progress)
> This will be helpful if we want to run cube build job continuously to reflect new data and can run merge cube for old segments in parallel without stopping the new cube build job.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)