You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Darrel Schneider (JIRA)" <ji...@apache.org> on 2015/07/14 20:01:05 UTC
[jira] [Created] (GEODE-113)
BridgeMembershipDUnitTest.testBridgeMembershipEventsInClient unit test
takes too long to run
Darrel Schneider created GEODE-113:
--------------------------------------
Summary: BridgeMembershipDUnitTest.testBridgeMembershipEventsInClient unit test takes too long to run
Key: GEODE-113
URL: https://issues.apache.org/jira/browse/GEODE-113
Project: Geode
Issue Type: Bug
Reporter: Darrel Schneider
Priority: Minor
I noticed the testBridgeMembershipEventsInClient method takes 3 minutes and 2 seconds to run.
And it gets run twice (once for BridgeMembershipDUnitTest and once for BridgeMembershipSelectorDUnitTest).
The cause of it running so long are 3 one minute pauses and 1 two second pause.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)