You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "Hive QA (Jira)" <ji...@apache.org> on 2020/05/17 15:23:00 UTC

[jira] [Commented] (HIVE-23353) Atlas metadata replication scheduling

    [ https://issues.apache.org/jira/browse/HIVE-23353?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17109527#comment-17109527 ] 

Hive QA commented on HIVE-23353:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/13003193/HIVE-23353.01.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 17272 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[special_character_in_tabnames_1] (batchId=78)
org.apache.hadoop.hive.metastore.txn.TestAcidTxnCleanerService.cleansAllCommittedTxns (batchId=152)
{noformat}

Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/22414/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/22414/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-22414/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 13003193 - PreCommit-HIVE-Build

> Atlas metadata replication scheduling
> -------------------------------------
>
>                 Key: HIVE-23353
>                 URL: https://issues.apache.org/jira/browse/HIVE-23353
>             Project: Hive
>          Issue Type: Task
>            Reporter: PRAVIN KUMAR SINHA
>            Assignee: PRAVIN KUMAR SINHA
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: HIVE-23353.01.patch
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>




--
This message was sent by Atlassian Jira
(v8.3.4#803005)