You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Yangze Guo (Jira)" <ji...@apache.org> on 2022/07/01 03:37:00 UTC
[jira] [Commented] (FLINK-28309) Introduce metrics of the duration that a task stays in each status
[ https://issues.apache.org/jira/browse/FLINK-28309?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17561252#comment-17561252 ]
Yangze Guo commented on FLINK-28309:
------------------------------------
master: bb8e1d14f05aca186ec874437eba3d44fbb3bd97
> Introduce metrics of the duration that a task stays in each status
> ------------------------------------------------------------------
>
> Key: FLINK-28309
> URL: https://issues.apache.org/jira/browse/FLINK-28309
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Metrics, Runtime / REST
> Reporter: Yangze Guo
> Assignee: Yangze Guo
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.16.0
>
>
--
This message was sent by Atlassian Jira
(v8.20.10#820010)