You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kudu.apache.org by "Ashwani Raina (Jira)" <ji...@apache.org> on 2026/08/05 09:28:00 UTC

[jira] [Assigned] (KUDU-3795) Scenarios in heavy-update-compaction-itest fail from time to time

     [ https://issues.apache.org/jira/browse/KUDU-3795?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Ashwani Raina reassigned KUDU-3795:
-----------------------------------

    Assignee: Ashwani Raina

> Scenarios in heavy-update-compaction-itest fail from time to time
> -----------------------------------------------------------------
>
>                 Key: KUDU-3795
>                 URL: https://issues.apache.org/jira/browse/KUDU-3795
>             Project: Kudu
>          Issue Type: Bug
>          Components: test
>            Reporter: Alexey Serbin
>            Assignee: Ashwani Raina
>            Priority: Major
>         Attachments: heavy-update-compaction-itest.20260804.txt.xz
>
>
> It seems long run times of the newly introduced scenarios in introduced heavy-update-compaction-itest lead to running out of space.  At least, the following error manifested itself at least once in ASAN build:
> {noformat}
> [ RUN      ] EvictionPolicyTypes/HeavyUpdateCompactionITestWithEvictionPolicy.TestHeavyUpdateCompaction/0
> ...
> F20260805 02:55:17.034668 20926 tablet_replica_mm_ops.cc:287] Check failed: tablet->HasBeenStopped() Unrecoverable flush failure caused by error: IO error: Unable to allocate new delta data writable_block: No directories could be added (1 dirs total, 0 failed, 1 full): IO error: No directories available in 098265df96824e218d5bd2329db27d5b's directory group (1 dirs total, 0 failed, 1 full) (error 28) (error 19)
> {noformat}
> Full log is attached.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)