You are viewing a plain text version of this content. The canonical link for it is here.
Posted to mapreduce-dev@hadoop.apache.org by "Thomas Graves (Created) (JIRA)" <ji...@apache.org> on 2012/02/22 22:41:48 UTC

[jira] [Created] (MAPREDUCE-3897) capacity scheduler - maxActiveApplicationsPerUser calculation can be wrong

capacity scheduler - maxActiveApplicationsPerUser calculation can be wrong
--------------------------------------------------------------------------

                 Key: MAPREDUCE-3897
                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-3897
             Project: Hadoop Map/Reduce
          Issue Type: Bug
          Components: mrv2
    Affects Versions: 0.23.0
            Reporter: Thomas Graves
            Priority: Critical


The capacity scheduler calculates the maxActiveApplications and the maxActiveApplicationsPerUser based on the config yarn.scheduler.capacity.maximum-applications or default 10000.  

MaxActiveApplications = max ( ceil ( clusterMemory/minAllocation * maxAMResource% * absoluteMaxCapacity), 1)  

MaxActiveAppsPerUser = max( ceil (maxActiveApplicationsComputedAbove * (userLimit%/100) * userLimitFactor), 1) 

maxActiveApplications is already multiplied by the queue absolute MAXIMUM capacity, so if max capacity > capacity and if you have user limit factor 1 (which is the default) and only 1 user is running, that user will not be allowed to use over the queue capacity, so having it relative to MAX capacity doesn't make sense.  That user could easily end up in a deadlock and all its space used by application masters.


--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira